Regulation 

5.1 

Control, security and regulating elements.  

 

As a standard the boiler is delivered without the supreme regulation and is equipped with a control panel incl. 
a network module. 
The manufacturer  doesn’t  recommend  to  operate  the  boilers  without  the  supreme  regulation.  The  standard 
version (without the regulation) is designed for the customers who have their own boiler control system. 
Besides the network module in the control panel there is mounted an instrument cluster - thermomanometer  

 

 

The network module is equipped with the elements as follows: 

The main switch with signalling  

Temperature excess signalling (safety thermostat and combustion gases reflux fuse) 

Automatics unblocking incl. the fault signalling  

safety  thermostat  unblocking  (at  the  open  systems  keep  the  setting  from  the  manufacture  it  means  
97 °C, at the closed systems with a pressure expansion reservoir can be set up to 105°C) 

the combustion gases reflux fuse unblocking (set to 75 °C) 

the boiler thermostat (as a standard it is delivered in the range between 0 and 85°C) 

the  sensor  of  combustion  gases  reflux  fuse  is  positioned  in  the  horizontal  draught  diverter  and  in  case 
that there is an insufficient flue gas installation the sensor switches off the boiler. The sensors of both the 
boiler  and  safety  thermostats  of  the  thermometer  and manometer  clack  valve  are  installed  in  the  basin 
(in the upper part of the left outer section). 
 

At  request  there  is  delivered  to  the  boiler  one  of  four  kinds  of  regulation  or  their  combinations 
according  to  the  ordering  key  stated  in  chapter  no.  1.1.  The  regulators  are  delivered  in  a  separate 
package  and  in  place  of boiler  installation  they  are  mounted  into the  control  panel  as  directed.  The 
vacancies in the panel are in a standard delivery equipped with blind flanges.  

 

The most important characteristics of Landis&Staefa regulators: 

 

an equitherm regulation  

 

a quick attenuation and a quick change in heating medium temperature (a quick attenuation and a quick 
firing) 

 

The summer/ winter operation is switched-over automatically  

 

The boiler is unloaded when being started  

 

The boiler is protected against overheating (the pump after-running) 

 

The  boiler  heating  water  minimum  and  maximum  values  (heating  water  temperatures  at  the  boiler 
output) are set 

 

An antifreeze protection is guaranteed for plant and equipment 

 

The pumps protection by their regular starting.  

 

The heating time schedule programme (can be programmed separately every day during the week) 

 

The possibility of mutual co-operation among up to 16 regulators of RVA series 

 

In  case  that  the  ether  QAA50  or  QAA70  indoor  gadget  is  connected  there  is  the  possibility  of  boiler 
remote  control  and  there  is  guaranteed  the  adaptation  of  heating  curves  depending  on  the  building 
structure and the heat demand 

 

On the top of it the RVA 33.121, RVA 43.222 and RVA 63.280 regulators have: 

 

The  function  of  a  "chimney  sweeper  "  –  the  boiler  is  automatically  put  into  operation  for  required 
measurement  of  combustion  gases  –  the  boiler  is  operated  in  full  swing  regardless  the  set  automatic 
regime. 

 

Registration of running hours and number of burner starts.  

Summary of Contents for G 90 Series

Page 1: ...Hercules U26 N vod k obsluze VIADRUS G 90 MANUAL FOR BOILER OPERATION AND INSTALLATION...

Page 2: ...ion 25 7 1 Checking activity before commissioning 25 7 2 Commissioning 25 7 3 Setting and regulation of the boiler heat output 25 7 3 1 Setting and regulation of the boiler heat output for 8 sectional...

Page 3: ...network module At request a delivery in a decomposed state is possible The accessories delivered at request are not included in the boiler basic price regulation A1 A4 according to the order specifica...

Page 4: ...hand side or from the right hand side it doesn t apply to the 8 sectional version 9 Possibility to connect the boiler in an cascade 10 Possibility to equip with an equitherm regulation 11 Two stage bu...

Page 5: ...mal output m 3 m 3 20 18 15 8 21 6 18 13 Volume of dry combustion gases actual at the minimum thermal output m 3 m 3 23 63 20 1 24 8 23 6 Emission values CO mg m 3 5 6 8 7 NOx mg kWh 33 33 27 23 Grade...

Page 6: ...t a part of which is the protective plate made of the stain steel The atmospheric burner composed of oval low emission burner tubes is made of the stain steel Individual tubes are mounted on the burne...

Page 7: ...7 Number of sections 8 10 12 15 L mm 995 1155 1315 1555 L1 mm 815 975 1135 1375 A mm 878 5 941 941 941 D mm 200 200 225 250 Fig no 2 The main dimensions of the boiler Gas inlet...

Page 8: ...8 1 boiler drum 2 boiler shell 3 regulation and safety elements 4 gas fitting 5 horizontal draught diverter 6 atmospheric burner Fig no 3 Boiler assembly...

Page 9: ...r one of four kinds of regulation or their combinations according to the ordering key stated in chapter no 1 1 The regulators are delivered in a separate package and in place of boiler installation th...

Page 10: ...mixing valves Other regulator characteristics are as follows the heating circuits can be set as independent two separate heating circuits or as dependent floor heating in combination with radiators a...

Page 11: ...tab no 2 setting to the given nominal heat output is done by the manufacturer It works in the regime of a nominal reduced heat output Fig no 4 VR 4601 QB 2001 with High Low coil reel and the output to...

Page 12: ...closing the ionisation circuit there will open the main valve for gas inlet into the main burner In case that the pilot burner hasn t ignited within the safety time of Ts 50 sec the automatics will cl...

Page 13: ...on electrode F1 Fuse 4 A F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X...

Page 14: ...ibution box A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas p...

Page 15: ...ation electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety...

Page 16: ...lure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Ho...

Page 17: ...s Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y 2 Gas Valve Honeywell VR4605QB 2002 Z1 Anti interference element PS3 Minimal water level guard SP1...

Page 18: ...onization electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 sa...

Page 19: ...voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X1 0 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22...

Page 20: ...A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressure gu...

Page 21: ...ization electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safe...

Page 22: ...commendations for polyethylene MOP up to and including 10 bar EN 12007 3 Gas supply systems Pipelines for maximum operating pressure up to and including 16 bar Part 3 Specific functional recommendatio...

Page 23: ...le both the pad and the bedding exceed the boiler ground plan on all sides by 15 mm 2 A safe distance from the flammable materials when installing and operating the boiler it is necessary to keep a sa...

Page 24: ...es invalid The heating systems with an open expansion tank make possible a direct contact between the heating water and the atmosphere At the period of the heating season the water expanding in the ta...

Page 25: ...the pilot burner In case that the ignition cycle has passed but the burner didn t catch fire there will light up the breakdown signalling on the network module see Fig no 18 If the ignition fails rep...

Page 26: ...electromagnetic gas valves for the sizes with 10 12 and 15 sections Reduced output setting and adjusting 1 Put the boiler into operation 2 Measure the gas inlet pressure which must be between 15 and 2...

Page 27: ...on the High Low coil 10 Check the combustion purity by using the combustion gases analyser NOx CO 7 3 3 Heat output setting and adjusting at the boiler equipped with Honeywell electromagnetic gas valv...

Page 28: ...a way making sure that the required gas flow will be achieved 12 The gas flow at the reduced output can be adjusted by the regulation nut fig no 16 13 Check the combustion purity by using the combust...

Page 29: ...ltage recovery in the electricity network the burner will start up automatically The failure is unblocked manually by means of unblocking pushbutton in the network module 7 Safety thermostat unblockin...

Page 30: ...se will close the fuel supply to the boiler The fuse unblocking can be done by user by means of unblocking pushbutton TS A repeated boiler start can only be done after cooling down the combustion gase...

Page 31: ...ount the cover draught diverters and the upper cover of the boiler shell put the boiler into operation During the boiler operation the agent reacts with the deposits and in form of combustion gases it...

Page 32: ...onductors and or a faulty electrode Check the electrodes condition and the connection between ignition conductor and the earth wire 4 Boiler doesn t light up the ignition electrode is sparkling the fa...

Page 33: ...he date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory For the validity of his guarantee the manufacturer requires...

Page 34: ...unit EN 13429 2000 NO 3 1 Recovery by material recycling ensure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure...

Page 35: ...35...

Page 36: ...36 Date of revision 45 2012 ND GB...

Reviews: