89
7 Lay-up / Winter storage procedure
8 Electrical system
• Disconnect the battery cables.
• Charge batteries during winter lay-up regu-
larly if required!
• Follow the recommendations given on
pages
or consult the recommen-
dations given by the battery supplier for in-
spection and maintenance of the batteries.
n
ote
Never switch off the battery main switch di-
rectly after the engine has stopped.
Wait at least 2 minutes.
See page
Summary of Contents for D-LINE VD4.120
Page 2: ...ii ...
Page 132: ...130 ...