83
7 Lay-up / Winter storage procedure
Inspections and maintenance work to be carried out:
page
1
Clean the engine, remove any salt. Paint any rust spots and spray the whole engine with a protective
medium, for example CRC protective 6-66.
2
Drain off the water from the fuel system and fill the fuel tank.
3
Make sure that the engine fuel system is filled with a fuel mixture with protective properties.
4
Flush out the raw water circuit with fresh water and if necessary fill with antifreeze. Clean the heat
exchanger if necessary.
5
Make sure that the cooling system is filled with a suitable anti-freeze.
6
Change the oil filter and the engine oil.
7
Change the oil in the gearbox.
8
Disconnect the battery cables, charge the batteries if necessary and grease the battery terminals.
Summary of Contents for D-LINE VD4.120
Page 2: ...ii ...
Page 132: ...130 ...