 Operation manual and  installation instructions bow thrusters BOW5512D and BOW5524D

Electrical installation

Check that the voltage, recorded on the motor type plate, is in agree-
ment with the vessel’s circuit voltage. 

6.1  Choice of battery

The total battery capacity must be sufficient for the size of the bow 
thruste
See page 

107 

for the applicable battery capacity.

We recommend Vetus maintenance free marine batteries; these can 
be supplied in the following sizes: 55 Ah, 70 Ah, 90 Ah, 108 Ah, 120 
Ah, 143 Ah, 165 Ah, 200 Ah and 225 Ah.

We also recommend that each bow thruster is powered by its own 
separate battery or batteries. This allows the battery bank to be 
placed as close as possible to the bow thruster; the main power ca-
bles can then be short thus preventing voltage losses caused by long 
cables.

  n

ote

 

Be sure to only use ‘sealed’ batteries if the batteries are locat-
ed in the same compartment as the bow thruster.

The Vetus ‘SMF’ and ‘AGM’ maintenance-free batteries are ideally 
suited to this application.
Batteries that are not ‘sealed’ may produce small amounts of ex-
plosive gas during the charging cycle. 
Sparks generated by the carbon brushes of the bow thruster 
motor may ignite this explosive gas.

Always use batteries whose type and capacity are compatible for 
their use.

 c

aution

In extreme cases, for example when a battery with a capacity of 
five times or more than suggested is used, there is the danger 
of causing permanent damage to one or more of the following 
shaft connections:

 - The connection between motor shaft and the tail piece input 

shaft.

 - The connection between the tail piece output shaft and the 

propeller.

6.2  Main switch

The main switch must be fitted to the ‘posi-
tive cable’.
The Vetus battery switch type BATSW250 is 
a suitable switch.

6.3  Main power cables (battery cables)

The minimum diameter must be sufficient for the bow thruster’s cur-
rent draw in use and the voltage drop must not be more than 10% of 
the voltage supplied, consult the table on page

107

.

  n

ote

The maximum duration of engagement and the thrust, as 
specified by the technical details in your bow thruster instal-
lation and operating manual, are based on the recommended 
storage battery capacities and storage battery connection 
cables.

If appreciably larger batteries in combination with very short 
connection cables with appreciably larger diameter than 
recommended are used then the thrust will increase. In such 
cases the maximum operating time must be reduced in order 
to prevent damage to the motor.

6.4  Connecting the main power cables

Make sure that no other electrical parts come loose when con-
necting the electric cables.

Check all electrical connections after 14 days. Electrical parts 
(such as bolts and nuts) may come loose as a result of fluctua-
tions in temperature.

•  Connect the main power supply cables.

Main switch with remote control

Instead of a storage battery main switch, a 

remotely controlled main 

switch annex emergency stop

 can be installed.

This remotely controlled main switch is available for 12 or 24 Volt DC.
Vetus art. code: BPMAIN12 respectively BPMAIN24.

 

ENGLISH

  n

ote

Be careful not to rotate the bolt and nut 1 while connecting the 
cables.
To prevent this happening, keep an open-ended spanner on nut 
1 while screwing on bolt 2, without rotating this spanner. 
The torque for nut 2 is 9 - 11 Nm (6.5 - 8 ft.lbf).

Summary of Contents for BOW5512D

Page 1: ...instructies Bedienungshandbuch und Einbauanleitung Manuel d utilisation et instructions d installation Manual de manejo y instrucciones de instalaci n Manuale per l uso e istruzioni per l installazion...

Page 2: ...over deze handleiding kan beschikken Make sure that the user of the vessel is supplied with the owner s manual Sorgen Sie daf r da dem Schiffseigner die Gebrauchsanleitung bereitgestellt wird Veillez...

Page 3: ...of battery 22 6 2 Main switch 22 6 3 Main power cables battery cables 22 6 4 Connecting the main power cables 22 6 5 Fuses 23 6 6 Bow thruster control panels 23 6 7 Delay when reversing the thrust dir...

Page 4: ...in the electric motor After use the motor must be allowed to cool off Note The maximum continuous length of usage and the thrust as specified in the technical details are based on the recommend ed bat...

Page 5: ...tion examples To achieve the optimum performance position the thruster tunnel as far forward as possible Set up 2 bow thrusters in a catamaran If in addition to controlling the movement of the bow the...

Page 6: ...side C with a length of 0 1 to 0 15 x D and make sure that the angle be tween the tunnel and the sloped side will be identical to the angle between the sloped side and the ship s hull A The connection...

Page 7: ...The outside of the tunnel must be roughened Remove all of the top surface down to the glass fibre Use a grinding disc for this Important After the tunnel been sawn to length treat the end of the tube...

Page 8: ...piece The 2 bushes are only required for trans port and are now no longer needed 5 2 Installation tailpiece and intermediate flange Ensure that the plastic shim plate 1 has been positioned on the tail...

Page 9: ...er Slide the flexible coupling onto the output spindle of the electric motor as far as necessary to allow the end of the output spindle A and the underside of the flange B to become aligned Tighten th...

Page 10: ...il piece input shaft The connection between the tail piece output shaft and the propeller 6 2 Main switch The main switch must be fitted to the posi tive cable The Vetus battery switch type BATSW250 i...

Page 11: ...he battery as possible This fuse protects the on board power cabling from short circuits For all fuses we can suppy a fuse holder Vetus part no ZEHC100 See page 107 for the size of the fuse to be used...

Page 12: ...ge After pressing the on off switch on the panel the panel is not switched on The on off switch must be pressed a second time within 6 sec onds The LED will then remain green and the buzzer will confi...

Page 13: ...L 1 10 106 020522 11 vetus Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 9 Hoofdafmetingen Principal dimensions Hauptabmessungen Dimensions principales Dimensiones...

Page 14: ...gpropell N dvendig batterikapasitet Total lengde pluss og minuskabel Ledning tverrsnitt Sikring Min Maks treg Vetus art kode Keulapotkuri Vaadittava akkukapasiteetti Miinus ja plus kaapeleiden koko na...

Page 15: ...Bedieningspaneel Control panel Bedienungspaneel Panneau de commande Tablero de mandos 7 Accu Battery Batterie Batterie Bater a 8 Steker Plug Stecker Prise m le Clavija macho 9 Contrasteker Socket Kont...

Page 16: ...Betjeningspanel Man verpanel Kontrollpanel Ohjauspaneli Pulpit operatora 7 Batteria Batteri Batteri Batteri Akku Akumulator 8 Spina maschio Stik Stickkontakt St psel Pikaliitin Wtyczka 9 Spina femmin...

Page 17: ...trave avec 1 panneau Manejo simult neo de 2 tornillos de retenci n con 1 panel Comando contemporaneo di 2 eliche di prua mediante 1 solo pannello Samtidig betjening af 2 bovpropeller med 1 betjenings...

Page 18: ...BOW5512D Set of 8 pcs of carbon brushes for BOW5512D 1 SET0127 Set van 4 stuks koolborstels voor BOW5524D Set of 4 pcs of carbon brushes for BOW5524D 4 1 BPC00100 Relaiskap Relais cover 5 1 SET0006 S...

Page 19: ...vetusb v FOKKERSTRAAT 571 3125 BD SCHIEDAM HOLLAND TEL 31 0 0 88 4884700 sales vetus nl www vetus com Printed in the Netherlands 020522 11 2019 08...

Reviews: