32
020808.01
vetus®
Installation instructions BOW PRO Series Thrusters: BOWB065, BOWB076, BOWB090, BOWB110 and BOWB130
- BPPJA
- BPPPA
5 .6 Connecting control voltage cables
• Mount the control panel at the helm position. There must be 150
mm of free space behind the panel.
• Connect the panel as shown in the dia-
gram.
See diagrams on page
165 if several pan-
els have to be connected.
• Connect the hub to a 12-Volt power sup-
ply.
+
–
12 V
Control panel
Control voltage fuse
CAN-bus supply
Connection box thruster
Terminator
Connection cable
Connection cable
24 V
n
ote
The CAN bus supply must always be
connected to 12 volts .
Main power fuse 2
In the connection unit, there is a main power fuse on the controller.
This fuse protects the controller and motor against short circuit/
overloading and it must remain present under all circumstances .
n
ote
When replacing the fuse, the replacement must be of the same rat-
ing .
+
–
12 V
+
–
12 V
5
M
8
5
M
8
n
ote
The CAN bus is a chain to which the bow
thruster and the panels are connected.
At one end of the chain, the power supply
(3) must be connected and the terminator
(7) must be connected at the other end!