4
Initial assembly of the VETTER SmartFork
®
4.1
Installing the VETTER SmartFork
®
on the fork carriage
NOTICE!
Initial assembly of the VETTER Smart
Fork
®
may only be carried out by a
service specialist.
Personnel:
n
Service specialist
Protective equipment:
n
Industrial helmet
n
Protective work clothing
n
Protective gloves
n
Safety shoes
Special tool:
n
Lifting device
Carry out installation of the VETTER Smart
Fork
®
on the fork carriage in the following
order:
1.
Prepare the lifting device for large loads, e.g. indoor crane and lifting straps. The
work is to be carried out by 2 people.
2.
Move the fork carriage to the vertical position and move it to a height that allows for
safe and comfortable installation of the VETTER Smart
Fork
®
.
3.
Remove the locking screw on the assembly side of the fork carriage.
Fig. 17: Opening the locking device
4.
Open the locking device of the VETTER Smart
Fork
®
by lifting the lever (fig. 18).
Initial assembly of the VETTER SmartFork
®
Installing the VETTER SmartFork® on the fork carriage
V1.08/2019
SmartFork
®
- The intelligent SensorFork
32
Summary of Contents for Smartfork
Page 2: ...V1 08 2019 SmartFork The intelligent SensorFork 2 ...
Page 61: ......