![Vetter SmartFork FrontCam ATEX Operating Instructions Manual Download Page 30](http://html.mh-extra.com/html/vetter/smartfork-frontcam-atex/smartfork-frontcam-atex_operating-instructions-manual_1010244030.webp)
4
Assembly
4.1
Installing the SmartFork
®
on the fork carrier
Assembly site free of potentially explosive atmosphere!
Never perform assembly or disassembly of the SmartFork
®
inside poten-
tially explosive atmospheres.
Personnel:
n
Driver of industrial trucks
Protective equipment:
n
Protective work clothing
n
Industrial helmet
n
Protective gloves
n
Safety shoes
Special tool:
n
Lifting device
Carry out assembly of the Smart
Fork
®
on the fork carrier in the following order:
1.
Prepare the lifting device for large loads, e.g. indoor crane and lifting straps. The
work is to be carried out by 2 people.
2.
Move the fork carrier to the vertical position and move it to a height that allows for
safe and comfortable assembly of the fork arm.
3.
Remove the locking screw on the assembly side of the fork carrier.
Fig. 6: SmartFork
®
locking device
4.
Open the locking device by raising the lever (Fig. 6).
Assembly
Installing the SmartFork® on the fork carrier
SmartFork
®
FrontCam ATEX for use in the Ex zone - BVS 20 ATEX E 108 X
30
EN