Bio-3 

Reactor

Greywater Reactor Installation, 
Operation & Service Instructions

Summary of Contents for BIO-3 REACTOR

Page 1: ...Bio 3 Reactor Greywater Reactor Installation Operation Service Instructions...

Page 2: ...CONTENTS Bio 3 Reactor properties Safety Operating principle Installation requirements Installation 01 02 03 04 05 Commissioning operation service warranty contact information 06...

Page 3: ...Temporary capacity 900 l day Oxidation 1 air pump 45 W Material Concrete Plastic Weight Height Diameter Sewer inlet bottom Sewer outlet bottom Risers approx 1 200 kg 2 200 mm 1 200 mm 1 215 mm 110 mm...

Page 4: ...e riser section The electrical installation must be carried out by a professional electrician with the necessary permits The cover must be locked with a padlock Please take the weight of the tank into...

Page 5: ...biomodules enhances the treatment of the nutrients contained by the wastewater 1 The greywater is conveyed into the tank s first compartment through an inclined sewer In the first compartment fats an...

Page 6: ...xcavator Sand bedding Frost insulation Soil compactor Well ring hoist grippers Hammer Professional electrician Shovel Installer Sewers sewer components 110 mm Lubricant Padlock Spirit level Tape measu...

Page 7: ...seal stays in place during the installation 7 NB If the sewer is at a depth exceeding 700 mm install a sufficient number of concrete well rings between the bottom section and the riser Seal the joint...

Page 8: ...e air pump s filter annually when the tank is emptied Unscrew the screw on top of the blower using a screwdriver Remove the filter cover and clean or change the filter Put the clean filters back in pl...

Page 9: ...Maintenance Operations Notes DATE MAINTENANCE OPERATION PERFORMER...

Page 10: ...Surname Address Telephone E mail Name Surname Address Telephone E mail Name Surname Address Telephone E mail Water Sewage Consultant Planning Place of Purchase Supplier Sludge Removal Installer Contr...