Vestelli BIO-3 REACTOR Installation, Operation And Service Manual Download Page 8

Installation

Fill the tank with water.
Carefully check that the air pump is firmly attached to its stand and the air hose is connected.
Connect the electric plug in the socket and check that oxygen bubbles start rising in the 
biomodules.
Put the insulated cover in place.
Lock the cover with a separate padlock.

Operation & service

Do not run any other water into the sewer except water from bathing, laundering or 
dishwashing
The air pump can be switched off during long interruptions in use.
If the bio reactor is not used during the winter months and the blower is switched off, it must 
be unplugged and brought indoors.

Empty the tank when necessary and at least once annually. Fill the tank after emptying it.
When the tank is emptied, remove the coarse filter and rinse it.
Clean the air pump’s filter annually when the tank is emptied. Unscrew the screw on top of the 
blower using a screwdriver. Remove the filter cover and clean or change the filter. Put the clean 
filters back in place and fasten the screw.
Check that the air pump is firmly closed and functioning.

If you detect any disruptions in operation, contact Jätevesiliike Vestelli Oy’s customer service on +358 10 232 7220.

Contact 

information

Jätevesiliike Vestelli Oy

Aleksanterinkatu 29 A, 2nd floor, FI-33100 Tampere
Production: Kauhakorvenkatu 43, FI-33720 Tampere

+358 10 232 7220

[email protected]

www.vestelli.fi 

Business ID: 2364009-4

Warranty

The Bio-3 Reactor has a 2 year warranty against defects in materials and workmanship. All warranty claims 
have to be made under the time of warranty.
The warranty is considered to start on the day of purchase, and the warranty period does not restart with 
service or repairs.
The warranty does not cover errors in installation, planning or operation.

Summary of Contents for BIO-3 REACTOR

Page 1: ...Bio 3 Reactor Greywater Reactor Installation Operation Service Instructions...

Page 2: ...CONTENTS Bio 3 Reactor properties Safety Operating principle Installation requirements Installation 01 02 03 04 05 Commissioning operation service warranty contact information 06...

Page 3: ...Temporary capacity 900 l day Oxidation 1 air pump 45 W Material Concrete Plastic Weight Height Diameter Sewer inlet bottom Sewer outlet bottom Risers approx 1 200 kg 2 200 mm 1 200 mm 1 215 mm 110 mm...

Page 4: ...e riser section The electrical installation must be carried out by a professional electrician with the necessary permits The cover must be locked with a padlock Please take the weight of the tank into...

Page 5: ...biomodules enhances the treatment of the nutrients contained by the wastewater 1 The greywater is conveyed into the tank s first compartment through an inclined sewer In the first compartment fats an...

Page 6: ...xcavator Sand bedding Frost insulation Soil compactor Well ring hoist grippers Hammer Professional electrician Shovel Installer Sewers sewer components 110 mm Lubricant Padlock Spirit level Tape measu...

Page 7: ...seal stays in place during the installation 7 NB If the sewer is at a depth exceeding 700 mm install a sufficient number of concrete well rings between the bottom section and the riser Seal the joint...

Page 8: ...e air pump s filter annually when the tank is emptied Unscrew the screw on top of the blower using a screwdriver Remove the filter cover and clean or change the filter Put the clean filters back in pl...

Page 9: ...Maintenance Operations Notes DATE MAINTENANCE OPERATION PERFORMER...

Page 10: ...Surname Address Telephone E mail Name Surname Address Telephone E mail Name Surname Address Telephone E mail Water Sewage Consultant Planning Place of Purchase Supplier Sludge Removal Installer Contr...

Reviews: