background image

VES Andover Ltd Eagle Close Chandlers Ford Ind. Est Eastleigh Hampshire SO53 4NF
Tel: 08448 15 60 60  Fax: 02380 261204  E-mail: [email protected] Web: www.ves.co.uk

ecovent 

NRG

 Air Handling Units

Installation, Operation and Maintenance Manual

12

Continued

Prior to starting the unit it is important to ensure that the fans are free running, and should any 
components have moved during transit take care to ensure they are realigned to allow correct 
operation/rotation. The same should be applied to any wiring looms which may have become 
unfastened; ensure that loose wiring is securely stowed away from any moving components.
Inverter-driven plug fans are supplied as a balanced assembly and should not be disassembled,
however the assembly is secured for transit with bolts as shown; these should be removed prior
to start-up.

Units size 0, 1 and 2 are supplied with a PS17 dual fan speed controller for commissioning; see the 
accompanying speed controller documentation for further operational details.

Units size 7, 8 and 9 are supplied with fi tted 3phase inverters for fan speed control and 
commissioning; see the accompanying inverter documentation for further operational details.
The centrifugal plug fans have infi nite adjustment and when controlled by inverter, the benefi ts of 
real energy savings are apparent when the fan speed is reduced; this is best demonstrated when 
used in conjunction with additional sensors such as air quality or occupancy.
Using a micro manometer and adjusting the fan speed via the inverter it is possible to commission 
each fan to the required air volume. Each fan section has a differential pressure tapping connection 
point; by connecting your micro manometer to the appropriate pitot a differential pressure reading 
can be taken. 

This commissioning technique is only applicable to unit sizes 7, 8 and 9 with inverter control.

Typical plug fan set-up showing necessary transit bolt removal

Important

Typical plug fan set-up

showing necessary transit

bolt removal

Fig.

Differential Pressure

Tapping point

Fig.

Standard Wiring

& Fan Installation

5

Remove

Summary of Contents for ecovent NRG

Page 1: ...ic current and high voltages Indicates hazards that require safety advice for personnel and or potential unit property damage Indicates important information Page Introduction 1 Nomenclature 2 Receipt...

Page 2: ...Null Single Skinned DS 25mm double skinned mineral wool in ll PB 25mm double skinned plasterboard in ll EE 50mm double skinned mineral wool in ll 10 Handing RT Right Top Access denotes position of RB...

Page 3: ...ided in accordance with Health and Safety and Building Regulations For con rmation of required access please see the appropriate unit outline drawing note that some access doors are hinged For optimum...

Page 4: ...rods If required the unit can be further secured to the oor via knockout xings holes on the feet xings to be supplied by others Standard units should be mounted in the horizontal plane level with lid...

Page 5: ...move the four support covers as shown retaining the screws Take especial care when working around the speed controller section Remove the heat exchanger carefully lifting straight up and out taking ca...

Page 6: ...hanger and silicon into place along upright angles Turn the drain pan over so that the drain sump now faces the heat exchanger upside down and replace in the unit making sure that the drain is adjacen...

Page 7: ...is the correct way up taking special notice on bottom access units Slide the pump down onto the bracket as shown Fit the pump sensor in the drain pan sump as shown Secure the sensor into place using s...

Page 8: ...ant local codes of practice Where threaded con nections are supplied the only approved method of jointing method is by use of Boss white and hemp The thread tted to the coil is to be supported at all...

Page 9: ...and prone to water logging it should be properly trapped just before the coil If the steam is from a high pressure steam main it is essential to have a working pressure relief valve on the low side to...

Page 10: ...for special versions of the units consult the wiring diagram in your document pack or contact our customer services department on 08448 15 60 60 quoting the sales order SO number and unit type as foun...

Page 11: ...C A C400V F 2 ZB501 0 40 1 70 4 50 8 3 SNS641 0 49 2 20 5 00 10 4 SNS641 0 49 2 20 5 00 10 5 SNS741 0 73 3 30 7 00 12 6 SNS841 1 30 5 70 15 0 30 Model 400V 3PH 50Hz ecoNRG Unit Fan Motor Power kW FLC...

Page 12: ...d controller documentation for further operational details Units size 7 8 and 9 are supplied with tted 3phase inverters for fan speed control and commissioning see the accompanying inverter documentat...

Page 13: ...ted to the air volume via the energy conservation rate as per the graph below Simply read across from the pressure measurement to the appropriate fan curve and down to calculate the resultant air volu...

Page 14: ...avily soiled or damaged in any way they should be replaced The fan impeller should be cleaned every 6 months Failure to clean the fan on a regular basis could result in loss of fan performance or caus...

Page 15: ...RG air handling units Type NRG Manufacturer VES Andover Limited The product above is produced in accordance with EC Council Directives 2004 108 EC Electromagnetic Compatibility Directive 2006 95 EC Lo...

Page 16: ...12 24 months from the date of dispatch This can be covered at a cost of just 3 of order value minimum charge 50 00 Option 3 12 36 Month Extended Warranty 12 36 months from date of dispatch For this c...

Reviews: