Vertiv
™
| Liebert® XDC | User Manual
38
4.5. Commissioning Inspection Checklist
After debugging, check and confirm according to
.
Table 4-1 Commissioning Inspection Checklist
Inspection Items
Results
All output functions are automatic
The temperature and humidity settings and control accuracy are correct
Whether there is any abnormal alarm
Other settings are correct