Vertiv
| Liebert
®
EXM
™
Battery Cabinet User Manual |
20
2.5
Batteries Approved for Use in Liebert EXM Systems
2.5.1
Floor Installation
If the Liebert EXM, Liebert BDC or battery cabinet is to be placed on a raised floor, the UPS should
be mounted on a pedestal that will support the equipment point loading. Refer to the bottom view
in
Figures 14
,
15
or
16
to design this pedestal.
The mechanical stops are used to prevent the cabinet from rolling and should not be used for
leveling or bearing the battery cabinet’s weight.
2.5.2 Cable Entry
Cables can enter the Liebert EXM, Liebert BDC and battery cabinets from the top or bottom
through removable metal plates.
Some plates have factory-punched holes and others are designed to allow the personnel to
punch holes for fitting and securing the conduit. Once the conduit holes are punched, these
plates should be reattached to the UPS. The conduit size and wiring method must be in
accordance with all local, regional and national codes and regulations, including NEC ANSI/NFPA
70.
Table 3
Batteries approved for use in Liebert EXM External Battery Cabinet, 320mm
Supplier
Part Number
Weight, Single
Battery, lb. (kg)
EnerSys
12HX150E
26 (11.8)
12HX205
43 (19.5)
East Penn
HR1500
27 (12)
HR2000
40 (18)
Table 4
Batteries approved for use in Liebert EXM External Battery Cabinet, 600mm
Supplier
Part Number
Weight, Single
Battery, lb. (kg)
EnerSys
12HX300-FR
60 (27.2)
12HX330-FR
71 (32.2)
East Penn
HR3000
61 (28)
HR3500
71 (32)
Table 5
Batteries approved for use in Liebert EXM External Battery Cabinet, 880mm
Supplier
Part Number
Weight, Single
Battery, lb. (kg)
EnerSys
12HX400-FR
80 (36.3)
12HX505-FR
103 (46.7)
12HX540-FR
106 (48.1)
East Penn
HR4000
80 (36)
HR5000
98 (44)
HR5500
107 (49)