1.4.2 Storing Batteries for Delayed Installation

If the battery system will not be installed immediately, it must be stored indoors in a clean, dry and 
cool location. Batteries should be unpacked, installed and charged as soon as possible after 
delivery.

NOTICE

Risk of failure to properly charge batteries. Can cause permanent damage to the batteries and void the 
warranty.

Batteries will self-discharge during storage. Batteries must be recharged as recommended by the battery 
manufacturer.

A notice of “Charge Before Date” is affixed to each unit that has batteries inside. The “Charge Before 
Date” is calculated based on the batteries being stored at 77°F (25°C). Storage at a higher temperature 
will increase the rate of self-discharge, requiring earlier recharge. Consult the battery manufacturer on 
how to determine when the batteries need to be recharged.

1.4.3 Installation Considerations
Position

—Refer to UPS manual (SL-25648 for 10-40kVA units, SL-25650 for 60-100kVA units or 

SL-26100 for 120-200kVA units) or submittals for complete system line-up details.
Liebert EXM Battery Cabinet(s) are designed to be located next to each UPS module on the left 
side only and are also available in stand-alone configurations with painted side panels. The front 
access design eliminates side and rear service clearance requirements. Refer to 

Tables 16

 

through

18

 for battery cabinet dimensions and weights.

Bolt-On Cabinets

—Matching battery cabinets are designed to bolt only onto the left side of the 

UPS module cabinet. Use bolts that ship with each unit to connect cabinet frames at posts, two 
places in the front and two places in the rear.

Service Clearance

—Allow front access to the battery cabinet at all times for maintenance and 

service. Electrical codes require that the battery cabinet be installed with no less than 3 ft. (1m) of 
clearance at the front of the cabinet when operating. No service clearance is required on either 
the side or rear. Clearance at the top of the cabinet is 24" (610mm).

Cables

 (10-120kVA units)—Cables may be run between the cabinets through cutouts in the top 

of the cabinet, eliminating the need for external conduit runs. Route cables before moving 
cabinets into final position for bolting together. No top or bottom entry cables are required, 
except for remotely located cabinets which require conduits.

Power terminals, auxiliary terminals blocks and circuit breakers are accessed from the front and top.
Removable panels on the top are secured to the chassis by screws. The door can be opened to give access to 
the power connections bars, auxiliary terminal blocks and breakers. The front door can be opened 180° for 
easier service and more flexibility in installation.

Software

—To allow the UPS to accurately display the battery run time, the number of battery 

cabinets must be noted when performing initial startup and setup using the configuration 
software. This is to be performed by the Vertiv engineer when commissioning the unit.

Casters and Adjustable Stops

—The adjustable stops are not designed to bear the full weight of 

the cabinet. Lower the stops until they are finger-tight in contact with the floor. Then tighten a 
small amount with a wrench (less than two turns) to give a good friction fit. When mounting the 
battery cabinet on seismic stands, ensure that the casters are bearing the weight of the cabinet.

Summary of Contents for Liebert EXM External Battery Cabinet

Page 1: ...Liebert EXM External Battery Cabinet User Manual...

Page 2: ...r damages resulting from use of this information or for any errors or omissions Refer to other local practices or building codes as applicable for the correct methods tools and materials to be used in...

Page 3: ...ted System 12 2 2 2 Stand Alone and Right Mounted Systems 12 2 2 3 Attached Detached System 13 2 2 4 Grounding 13 2 3 Control Connection 13 2 4 Non Standard Batteries 14 2 5 Batteries Approved for Use...

Page 4: ...circuit breaker and UPS wiring with external batteries with three connecting wires34 TABLES Table 1 Control wiring for Liebert EXM to battery cabinet 10 Table 2 Interconnect wiring for UPS to battery...

Page 5: ...ed prior to moving a battery cabinet after initial installation Battery cabinets contain non spillable batteries Keep units upright Do not stack Do not tilt Failure to heed this warning could result i...

Page 6: ...accordance with federal state and local regulations Because lead is a toxic substance lead acid batteries must be recycled rather than discarded Do not dispose of battery or batteries in a fire The b...

Page 7: ...uvrir ni percer les batteries car l lectrolyte qui s en coulerait est nocif pour la peau et les yeux Cet lectrolyte est toxique Lorsque vous travaillez avec des batteries prenez les pr cautions suivan...

Page 8: ...chaque armoire Testez le levage et l quilibre des armoires avant de transporter l appareil Maintenez en tout temps l inclinaison verticale minimale Les fentes situ es la base des armoires du module s...

Page 9: ...en mode de fonctionnement normal et que toutes les portes sont ferm es La zone entourant le syst me ASC doit tre exempte de flaques d eau d humidit excessive et de d bris Seuls des quipements d essai...

Page 10: ...nd cabinet for any shipping damage Exercise caution voltage is present within the battery cabinet even before installation If there are signs of damage do not proceed Call Vertiv at 1 800 542 2378 Rep...

Page 11: ...to connect cabinet frames at posts two places in the front and two places in the rear Service Clearance Allow front access to the battery cabinet at all times for maintenance and service Electrical c...

Page 12: ...a raised floor it should be mounted on a pedestal suitably designed to accept the equipment s point loading Refer to the base view to design this pedestal WARNING Risk of heavy unit falling over Impr...

Page 13: ...ery Cabinet Liebert EXM UPS Additional Liebert EXM Battery Cabinet RECOMMENDED INSTALLATION Battery cabinet systems ordered as left side installation will include factory supplied cabling to connect t...

Page 14: ...ed behind the output busbars All cabinets in the UPS system must be connected to the user s ground connection 5 Connect the system battery cables from the UPS battery terminals N to battery cabinet br...

Page 15: ...o battery cabinet From To Liebert EXM UPS Bypass Module J22 Battery Cabinet Terminal Strip TB1 J22 15 TB1 12 J22 13 TB1 11 J22 11 TB1 10 J22 1 TB1 6 J22 3 TB1 7 J22 5 TB1 8 J22 7 TB1 9 140 200kVA Lieb...

Page 16: ...ated Regular maintenance of the battery module is an absolute necessity Periodic inspections of battery and terminal voltages specific gravity and connection resistance should be made Strictly follow...

Page 17: ...ounded remove source of ground Contact with any part of a grounded battery can result in electrical shock Battery support tray must be used whenever a battery tray is being pulled out 2 1 1 Connecting...

Page 18: ...to each other the busbars are connected between battery cabinets with the supplied power cables 2 2 2 Stand Alone and Right Mounted Systems The customer must supply all interconnecting cables and hard...

Page 19: ...l the interconnecting cables and hardware See Table 13 for current ratings and recommended cable sizes 2 2 4 Grounding The ground cables and hardware will be supplied for cabinets ordered as connected...

Page 20: ...ve any questions concerning batteries battery racks or accessories contact Vertiv at 1 800 543 2378 Figure 4 Battery cabinet terminal detail 320mm cabinet 10 40kVA UPS NOTE The user supplied battery D...

Page 21: ...d Bus Detail A See Detail A EXM16004 Rev 0 3 66 93mm 3 66 93mm 1 75 45mm 1 75 45mm 1 65 42mm 4 96 126mm 1 65 42mm 1 75 45mm 1 75 45mm 600mm Battery Cabinet RIGHT SIDE Panel Removed 37 5 953mm DC Conne...

Page 22: ...et User Manual 18 Figure 6 Liebert EXM UPS terminal detail 10 40kVA FRONT VIEW Door Removed 23 6 600mm See Detail A 78 5 1994mm Batteries EXM16002 Rev 0 1 4 36mm 1 6 41mm 13 Places Typical DETAIL A Bu...

Page 23: ...2 4 1077mm FRONT VIEW Door Removed RIGHT SIDE VIEW Panel Removed DETAIL A 78 4 1991mm Batt N Batt Batt NOTES 1 Control wiring and power wiring must be run in separate conduits 2 Vertiv recommends usin...

Page 24: ...punch holes for fitting and securing the conduit Once the conduit holes are punched these plates should be reattached to the UPS The conduit size and wiring method must be in accordance with all loca...

Page 25: ...nal Block at J22 Refer to Figure 9 for circuit details Table 6 Battery cabinet interface J22 Pin Name Description 1 12V_DRV BCB driver signal 3 BCB STATUS BCB state signal 5 GND_DRY Dry ground 7 BCB_O...

Page 26: ...X9_J22 BAT_GND_FAULT GND_DRY GND_DRY GND_DRY 12V_A 12V_BCB_DRV TEMP_BAT BCB_ONLINE BCB_STATE UH8351A8 UHW241C2 BCB CONTROL BOARD 1 3 5 7 9 11 13 15 17 19 2 4 6 8 10 12 14 16 18 20 Ground 112 x4 X101 X...

Page 27: ...als disconnect the inter tier cable and two shelf retaining screws Once disconnected insulate with protective boot or electrical tape the cables to prevent accidental shorts The battery shelf can now...

Page 28: ...Vertiv Liebert EXM Battery Cabinet User Manual 24 When replacing batteries use the same number and type of batteries...

Page 29: ...accordance with federal state and local regulations Because lead is a toxic substance lead acid batteries must be recycled rather than discarded Do not dispose of battery or batteries in a fire The b...

Page 30: ...d essai doivent reposer sur des tapis de caoutchouc lors de toute intervention sur une pi ce d quipement sous tension Les batteries au plomb acide renferment des mati res dangereuses Les batteries do...

Page 31: ...panel features Connection Function Liebert IntelliSlot Bays 2 Enables remote connectivity and use of optional protocols Remote Alarm Reset Permits a remote alarm to be reset by shorting these two pins...

Page 32: ...ontact for charger control connection Charger control relay output for thermal runaway management Automatically shuts down charger when thermal runaway is detected RS 485 Connection Communication with...

Page 33: ...3 Jars 13 15 To Tray 4 Jars 22 24 To Tray 4 Jars 19 21 To Tray 2 Jars 10 12 To Tray 2 Jars 7 9 To Tray 1 Jars 4 6 To Tray 1 Jars 1 3 J5 J4 J3 J2 J1 Temperature 1 Transducers Current TB2 Blue Brown Br...

Page 34: ...stem does not include a Liebert Bypass Cabinet This is a safety feature and will prevent the UPS inverter from back feeding the bypass source The Alber BDSUi fuse block provides 208V nominal from the...

Page 35: ...s 320mm cabinet Ventilation 20 7 526mm 2 6 67mm 2 9 74mm 5 5 140mm 25 4 645mm Bracket Centers 1 8 45mm 34 3 872mm 9 4 239mm BOTTOM TOP EXM12003 Rev 0 DC Power Connections TB1 is Inside BIB Box LEFT SI...

Page 36: ...7 6 373 x 193mm Alber Service Plate 21 3 x 14 541 x 356mm 1 3 33mm 34 3 872mm 15 381mm 1 8 45mm 6 2 157mm 2 9 74mm 20 4 518mm BOTTOM TOP EXM12004 Rev 0 28 3 719mm Bracket Centers LEFT SIDE Panel Remo...

Page 37: ...Service Plate 17 5 x 14 445 x 356mm 14 1 358mm 14 1 358mm 34 3 872mm 1 8 45mm 5 7 145mm Conduit Landing 26 1 664mm 2 5 64mm BOTTOM TOP EXM12005 Rev 0 31 5 799mm 2 8 71mm LEFT SIDE Panel Removed FRONT...

Page 38: ...ight side of the UPS 11 Bypass cabinets can be 600mm BDC 200mm 2 4 breaker Maintenance Bypass Cabinet 10 40kVA only or 300mm 2 4 breaker Maintenance Bypass Cabinet 60 100kVA only 12 Refer to table for...

Page 39: ...2012 CBC 2010 Environmental Storage Temperature Range F C 13 F to 158 F 25 C to 70 C 74 F to 80 F 23 27 C for optimal battery life Operating Temperature Range F C 32 F to 104 F 0 to 40 C 74 F to 80 F...

Page 40: ...aker Maximum Battery Current A Battery Cabinet Size mm Copper Wire Compression Lug Bolt Size 10 40 225A 187 600 880 1 250kcmil 54868BE 2 Hole 1 2 10 40 225A 187 320 1 250kcmil 54174 1 Hole 3 8 60 120...

Page 41: ...mV C around 77 F 25 C or 86 F 30 C or inhibit Ripple Voltage 1 Ripple Current 5 Boost Charge Voltage 2 35 V cell selectable from 2 30 2 40V cell Boost Control Float boost current trigger 0 050 C10 sel...

Page 42: ...x 2000 Weight lb kg Frame Only No Batteries 689 313 with HX300 batteries 2213 1004 with HX330 batteries 2477 1124 with HR3000 batteries 2193 995 with HR3500 batteries 2433 1104 Color ZP 7021 Black Pr...

Page 43: ...Vertiv Liebert EXM Battery Cabinet User Manual 39 Figure 18 Battery circuit breaker and UPS wiring with external batteries with three connecting wires U P S N N...

Page 44: ...ight Tighten all connections at installation and at least annually thereafter See 5 4 Torque Requirements 5 1 Record Log Set up a maintenance log to record scheduled checks and any abnormal conditions...

Page 45: ...anding on rubber mats Lead acid batteries contain hazardous materials Batteries must be handled transported and recycled or discarded in accordance with federal state and local regulations Because lea...

Page 46: ...ser sur des tapis de caoutchouc lors de toute intervention sur une pi ce d quipement sous tension Les batteries au plomb acide renferment des mati res dangereuses Les batteries doivent tre manipul es...

Page 47: ...ilis es dans les armoires de batterie Liebert Reportez vous au manuel du fabricant des batteries disponible sur le site Web du fabricant pour obtenir des renseignements pr cis sur la charge d galisati...

Page 48: ...Vertiv Liebert EXM Battery Cabinet User Manual 44 NOTES...

Page 49: ...Vertiv Liebert EXM Battery Cabinet User Manual 45...

Page 50: ...Vertiv Liebert EXM Battery Cabinet User Manual 46...

Page 51: ......

Page 52: ...mes and logos referred to are trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness herein Vertiv Co assu...

Reviews: