6.7
Preparing to Lift the XTE 802G
General
Refer to “Transportation and Storage” on page 35.
Required Equipment When Using a Crane:
•
A crane capable of lifting the shipped weight of the equipped XTE 802G plus a safety margin.
-
10,000 lbs (4536 kg), or greater.
•
Four (4) wire-rope slings, 8-ft. (2.4 m) long (minimum). Slings should each have the capacity to support the entire shipped
weight of the equipped XTE 802G to prevent potential cascading failures.
-
8,000 lbs (3629 kg)
•
Spreader frames are required for shorter slings to prevent XTE 802G framework damage due to side-loading forces at the
top corner lifting eyes. Lifting forces shall be vertical only and applied only at the lifting eyes.
•
Four (4) connecting links (clevises), to attach the wire-rope slings to the XTE 802G lifting eyebolts. Connecting links should
each have the capacity to support the entire shipped weight of the equipped XTE 802G to prevent potential cascading
failures.
-
8,000 lbs (3629 kg)
•
A 75-ft (20 m) rope, 5/8” (1.5 cm) in diameter, to use as a tagline. A tagline is used to guide the XTE 802G into position while
it is lifted and lowered.
Required Equipment When Using a Forklift:
•
A forklift capable of lifting the shipped weight of the equipped XTE 802G plus a safety margin.
-
10,000 lbs (4536 kg), or greater.
•
Forklifts shall have a minimum fork length of 72 inches (183 cm).
Preparing to Lift the XTE 802G Procedure
1.
If not previously done, unpack the XTE 802G according to the instruction in “Unpacking and Preparing the XTE 802G at the
Installation Site” on page 36.
2.
If XTE 802G base cable entry covers are installed, remove the bolts from the XTE 802G base cable entry covers and set aside
the covers and hardware for later re-use. See