
29
3-90-20306760
Vermont Castings • Stardance SDDVTSB Installation Manual_R10 • 04/18
Signature Command Wiring Diagram
Figure 55
- Blower Wiring Diagram
To Junction Box
In Fireplace
WHITE
BLACK
WHITE
BLACK
BLACK
WHITE
GREEN
Connector
Pin To Contro l Box
{
{
Light
Optional
AUX
FP2684
BLOTSDVSC fan wiring
Figure 54
- Signature Command Wiring Diagram
RADVTSC
SCS 2 wire wiring
A/C MODULE
TO JUNCTION BOX
IN FIREPLACE
PLUG-IN
CONNECT
OR
WHITE
BLACK
BLACK
WHITE
GREEN
Opt. Blower
Opt. Aux.
Control Board
RF Receiver
ON/OFF Button
Pilot
Black / Thermopile
Red / Thermopile
Sensor
Ignitor / Sparker
Conversion
NG/LP
Plug-in Connector
Control Board to Command Center
OFF/LO
LED
ON/HI
Master Switch
Command Center
Optional
Wall Switch
Plug-in Connector
Stepper Motor to
Control Board
NOTE: Wall switch wires
must be connected together
if a wall switch is not being used.
DC Power/Green
Ground
Plug-in Connector
Control Board to
Solenoid
Gas In
Gas Out
Pilot Gas Tubing
Valve
300 Watt
Max.
Summary of Contents for SDDVTBDSB
Page 63: ......