3
CONTENTS
PAGE
Section 1
Information and Requirements
1.0
Appliance Information
3
1.1
Conditions of Installation
4
1.2
Flue and chimney suitability
4
1.3
Clearance to Shelfs – Rear Flue Fitting
5
1.4
Clearance to Beams – Top Flue Fitting
5
1.5
Chimney inspection
5-6
1.6
Hearths
7
1.7
Spillage Monitoring System
7
1.8
Fitting of the removeable door handle
7
Section 2
Installation of the stove
2.1
Unpacking the stove
8
2.2
Installing the stove
8
2.3
Min. / Max. dimensions of builders opening
9
/ void for rear flue fitting
2.4
Min. / Max dimensions of Inglenook for top
10
Flue fitting
2.5
Installation into brick or stone built
11-13
chimney
2.6
Installation into brick or stone built chimney
14-16
utilising a closure plate.
2.7
Installation using metal flue pipe with no
17-19
chimney.
2.9
Rotation of the flue spigot collar
20-21
2.10 Fitting the flue pipe or elbow to the stove
21
2.11 Making the gas connection
22
2.12 Gas soundness & burner pressure
22
Section 3
Assembling Fuel Bed and Commissioning
3.1
Assembling the ceramics and fuel bed
23-26
3.2
Lighting the appliance
27
3.4
Checking for clearance of combustion
27-28
products
Section 4
Maintenance
4.1
Removal of the burner assembly
29
4.2
Removal of the control tap
29
4.3
Removal of the pilot assembly
30
4.4
Removing the spillage detection switch
30
4.5
Adjustment of the door latch
30
4.6
Flue pipe options
31