![Vermont Castings Intrepid II Installation And Maintenance Instructions Manual Download Page 16](http://html1.mh-extra.com/html/vermont-castings/intrepid-ii/intrepid-ii_installation-and-maintenance-instructions-manual_1006285016.webp)
16
When sealing the closure plate (which is supplied) to the wall, use the screws and
Rawlplugs supplied. The foam seal which is supplied should be fitted to the rear of the
closure plate to ensure an airtight seal is obtained between the closure plate and the flat
sealing area of the wall. See diagram below.
Dimensions stated are for closure plate supplied
With the debris / register plate sealed into position and any sealing compound cured, and
with the flue outlet spigot in the correct position, set the stove to its required position and
insert and seal the flue pipe into the closure plate. Once this is complete, proceed with
the connection of the gas supply, fuelbed layout and commissioning of the stove.
See page 31 for flue pipe/elbow options.
A closure plate and fixings are supplied with the product.
Flat Sealing
Area
Closure
Plate
Screw
Fixing
Holes
660
mm
525mm