background image

DEFIANT ASSEMBLY

Lay all the parts out on the floor in sequence.  We recommend that you assemble the stove once 

without 

cement 

(dry fit) to make sure all the parts fit.  New parts may have to be ground or filed.  

At this time, regasket the front and load doors.  Replace the door pins if necessary.  Be careful when 
knocking the door pins out not to fracture the cast hinge bosses.  
Check the movement of the door handles.  If the handles are stiff, remove  and clean the shaft and the handle 
hole.  The door handle hole may be cleaned with a 3/8” drill bit.

All instructions in italics concern cementing or steps for permanent assembly.  

Follow non- italicized  

instructions for the dry fit assembly.

STEP 4  ASSEMBLE EXTERIOR CASTINGS

On the  inside of  the Bottom Plate,  place pieces 
of  masking  tape  over  the  leg  bolt  holes  to 
prevent  them  from  filling  with  furnace  cement 
during assembly.

  

Cement  all  four  channels  in  the  Bottom  Plate   
(FIG. 4).

Position  the Front  Plate  in the  channel on  the 
bottom  plate.   The curvature of  this  plate  will 
allow it to stand on its own.

Set  the  back  Plate  in  the  back  channel  of  the 
Bottom  Plate.  Hold  in place with  the wooden 
bridge.

If  using  a  new  baffle 
with  support leg,  attach 
the  support  leg  with  a 
1⁄4-20 x 1”Hex bolt and 
nut.  

Set the  (assembled) Right Inside Baffle  

 

to  fit 

in  place  between  the  Front  and  Back  Plates.   
The bridge may need to be adjusted (FIG. 5)

Cement  the  channels  of  the  Right  End  Plate 
(FIG. 6)

          

FIG. 4     Cement Channels in Bottom Plate

        

          

              

              

FIG. 5   Setting Baffle into Place

            
                             

        

              FIG. 6      Cement Channels on Right End

         

Summary of Contents for defiant iai

Page 1: ......

Page 2: ......

Page 3: ...130 3200 Top Exit Insert 39 500 7497 Set of 4 Tie Rods 160 1617 Washers Nuts 15 130 0088 Rear Exit Top 39a 120 2461 Star Washer included in 500 7497 130 0093 Top Exit Top 39b 120 3226 1 4 20 Hex Head...

Page 4: ......

Page 5: ...per pin hole W 3860 N A E Door handle holes 3 8 N A F Secondary air cover screw hole 22 10 24 G Air tube screw holes 5 16 H Ash lip holes 13 64 1 4 20 I Leg bolt holes 5 16 3 8 16 J Top tie rod holes...

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...cessary for Fireback replacement All other castings may be left in place Remove Right End Plate The Air Tube may be left in place Lift out Baffle Remove wooden bridge and rope Remove Front Plate Remov...

Page 17: ...he dry fit assembly STEP 4 ASSEMBLE EXTERIOR CASTINGS On the inside of the Bottom Plate place pieces of masking tape over the leg bolt holes to prevent them from filling with furnace cement during ass...

Page 18: ...of the Secondary Air Tube See FIG 11 below Cement along the top of the upper rib and the front of the lower rib on the Back Plate FIG 8 Cement the edges of the two ribs on the Lower Fireback FIG 9 Pl...

Page 19: ...er and lower fireback Tap the lower right corner of the Upper Fireback to persuade it into the channel on the Baffle If the firebacks are separated grind down the interlocking tabs so the Upper Fireba...

Page 20: ...TALL TOP PLATE Place cement in the four channels of the Top Plate FIG 16 Install the Top Plate Hammer the upper side and corners of the exterior plates until the Top Plate sets down over them FIG 16 C...

Page 21: ...stove with warm water and sponge Repaint the stove with paint provided Reattach hardware Load Door Handle Secondary Air Tube Cover Damper Handle Thermostat Assembly Replace Legs Doors and Griddle Reli...

Reviews: