![VERITAS NetBackup 523 Installation Manuals Download Page 23](http://html.mh-extra.com/html/veritas/netbackup-523/netbackup-523_installation-manuals_1004860023.webp)
Preparing for hardware
installation
This chapter includes the following topics:
■
■
■
■
■
■
Checking the shipping packages
Tools
The following tools and supplies are required for hardware installation.
■
Phillips screwdrivers M3-M6
■
Knife (for opening cartons)
■
ESD preventive wrist strap or gloves
■
Cable labels
■
Pen or pencil with which to write on labels
■
Cable ties and diagonal cutting pliers (optional)
■
Multimeter (optional)
3
Chapter