
Table of contents
Dura 5 - 35
4.0v-06.2013
3 | Page
Table of contents
Obligation of the operating company
Transport, storage and disposal
Unpacking and inspection on delivery
Interim storage before installation
Checking the ambient conditions
Preparing the installation site
Preparing the foundation and surface
Specifying supports and flange connections
Optimizing cross-section of pipe work
Providing safety and control devices
(recommended)
Fitting the port flange (Standard assembly)
Fitting the port flange (Split flange assembly)
Filling the pump with lubricant
Checking the direction of rotation with dry
pump
Switching off (Refer to → 6.1.3)
Returning the pump to the manufacturer
Re-installing the hose, port flanges, lubricant
refill and fitting the inspection window
Cleaning agents (After hose is removed)
Declaration of conformity according to EC
Machine Directive
Summary of Contents for Dura 10
Page 28: ...Dura 5 35 4 0v 06 2013 28 Page...