7.5.1 Calibration Procedure
Calibration operates as follows:
u
Set the Unit of Measure to perform the calibration.
u
Select the quantity field (QTY) as per
Figure 24
.
u
After the expected quantity is entered, the pump is ready
for calibration. Ensure you have suitable measuring
equipment to measure the correct dispensed value.
u
Press the START button to start the calibration. The quantity
displayed will decrease during the calibration process.
u
Once the pump has delivered the expected quantity, the
following message box will appear. Enter the quantity
actually delivered as per
Figure 25
.
Be careful to enter the correct dispensed value as this will
change pump running speed.
Press “
p
” to accept the calibration and the message box
will appear as per
Figure 26
.
Press “x” will abandon the calibration and the Job File will
not be updated.
The user can start another calibration by following the
steps listed previously.
Figure 24 Enter Expected Quantity
Note
Figure 26 Job Calibrated
Figure 25 Enter Achieved Quantity