
3
Table of Contents
System D with ground heat exchanger
4.1.1 Installation of the glycol-water ducts
4.1.4 Connection of the air ducts
4.1.5 Connecting the water-glycol ducts to the Aquacom and filling them.
..................................................................................... 12
4.2.2 Setting the external fan
4.3 Operation of the control unit
4.3.1 Operation of the control unit during summer operation
4.3.2 Operation of the control unit during winter operation
4.4 Maintenance by the installer
4.4.2 Check the glycol content
4.4.3 Check the heat exchanger
4.4.4 Cleaning the heat exchanger block
4.4.6 Check the pump operation
4.4.7 Check (and if necessary repair) the electrical wiring.
6.4 Connection scheme control unit
Summary of Contents for Comair Aquacom
Page 1: ......