![Vemco VR2W User Manual Download Page 30](http://html2.mh-extra.com/html/vemco/vr2w/vr2w_user-manual_4009550030.webp)
VEMCO - VR2W Manual
25
IMPORTANT
: Cut the cable ties when removing a VR2W from the mooring line. DO NOT re-use cable
ties. Use only new cable ties when deploying a VR2W receiver.
Wrap a third cable tie around the VR2W receiver and the rope so
the cable tie occupies the top half of the lower groove in the VR2W
body. The bottom half of the groove is already occupied by the
cable tie from Step 5
Latch the cable tie so the head of the cable tie is over the rope.
STEP 6
Wrap a fifth cable tie
around the VR2W
receiver and the rope so
the cable tie occupies the
bottom half of the groove
used in Step 7. Latch the
cable tie so the head of
the cable tie is over the
rope.
STEP 8
Open the warp in the rope
next to the groove closest
to the hydrophone and
slide another cable tie
through rope so it lines up
with the top half of that
groove.
Tighten the cable tie so
the tie’s head is next to
the rope.
STEP 7
Trim the cable ties so there is no excess cable tie material and no sharp edges.
STEP 9
Through Rope
Around Rope
Through Rope
Around Rope