IG-049-EN version 02; 02/10/2017
14
Installation
General Instructions
ormaset
Kiosk-type prefabricated transformer substation
9. Installation
When installing the
ormaset
at its location, it is essential
to follow current legislation on installations and electrical
networks, laws on occupational safety, local regulations and
the specifications of the utility company. The instructions
included in this document must be followed during
electrical installation.
The site should be visited in advance to check if
vehicles can have access and if there is adequate
space for the unloading operations, taking into
account the distances to overhead lines, slopes, etc.
9.1. Receiving the equipment
Upon receipt of the unit, carefully check:
1.
The general condition of the assembly.
2.
Absence of bangs or breakage, especially at the
connection points to other items or close to the DEHA
couplings.
3.
The state of the paintwork, checking for the absence of
chipping, scratches, etc.
4.
Presence of other accessories. If damage or absences
are observed, immediately inform the transport agent
and
Ormazabal
.
9.2. Location
The site location should be precisely defined, indicating
the alignment levels and the heights of the reference
points, such as: roads, kerbs, milestones, pavilions, fences,
electricity pylons, etc.
Incorrect levelling may cause the base of the tank or
the body to break.
9.3. Planning
On the location sketch or drawing, it is advisable to mark
out the spaces available for the crane and the transport
truck.
The existence of any circumstance or object that could
impede or obstruct the smooth operation of the installation
must be indicated (posts, cables, ditches, walls, pipelines,
etc.), marking their positions on the drawing with the
corresponding measurements.