
-15-
上
下
TOP
BOTTOM
———————————————————————————————————————
Note
There are two requirements for vertical installation:
⚫
The PLC must be installed below all IO modules.
⚫
Please use trunking to hold the cables during wiring to avoid snap sliding on the lower lead
rail. If this product is not to be fixed on the DIN lead rail, misoperation may occur.
2.3 Installation Precaution
⚫
Make sure the master and modules are powered down before installing or removing them.
Note
⚫
Do not hot-plug modules, which may cause the master to restart, user data loss or damage, etc.
⚫
Please do not drop or impact the master and module to avoid damage to the master and modules.
Summary of Contents for VH600
Page 20: ...19 DIN DIN snap Screw...