
5
.
2
C
onnect
T
he voltage supply and signal output are connected via the spring
-
loaded terminals in the housing
.
T
he connection to the indicating and adjustment module or to the
interface adapter is carried out via contact pins in the housing
.
P
roceed as follows
:
1
U
nscrew the housing cover
2
I
f an indicating and adjustment module is installed
,
remove it by
turning it slightly to the left
.
3
L
oosen compression nut of the cable entry
4
R
emove approx
.
10
cm
(
4
in
)
of the cable mantle
,
strip approx
.
1
cm
(
0
.
4
in
)
of insulation from the ends of the individual wires
5
I
nsert the cable into the sensor through the cable entry
F
ig
.
2
:
C
onnection steps
5
and
6
6
I
nsert the wire ends into the terminals according to the wiring plan
I
nformation
:
S
olid cores as well as
fl
exible cores with cable end sleeves are
inserted directly into the terminal openings
.
I
n case of
fl
exible cores
without end sleeves
,
press the terminal head with a small screwdriver
;
the terminal opening is freed
.
W
hen the screwdriver is released
,
the
terminal closes again
.
7
C
heck the hold of the wires in the terminals by lightly pulling on
them
8
C
onnect the screen to the internal ground terminal
,
connect the
outer ground terminal to potential equalisation
C
onnection technology
C
onnection procedure
14
VEGAPULS
62
standpipe version
•
F
oundation
F
ieldbus
5
C
onnecting to the bus system
36510
-
EN
-
120301