39089-US-210509
33
Maintenance
6
Maintenance
To prevent potential problems and comply with radiation regulations, VEGA
recommends the following maintenance schedule.
6.1 Periodic Maintenance Schedule
Description
Frequency
Procedure
Location
Annually
Ensure that the source holder is in the
correct location. If the source is not in
the correct location, contact your
regulatory agency immediately.
Mounting brackets
and hardware
Annually
Check for loose mounting hardware.
Tags and labels
Annually
Make certain the tags and labels are in
place and legible.
General
cleanliness
Annually
Make certain there is no buildup of dirt
or process material on operating
handles or cables.
Corrosion or
rusting
Annually
Check the housing and operating
handle.
Painting
As needed
Clean and paint as necessary. Do not
paint labels.
Source holder
shutter check ON/
OFF Mechanism
(On applicable
source holders)
Every six months unless
otherwise required by
applicable nuclear
regulatory agency
See the
Shutter (ON/OFF)
Mechanism
procedure.
Source wipe/Leak
test
Every three years unless
otherwise required by
applicable nuclear
regulatory agency
See the
Leak Test
procedure.
Summary of Contents for SHLG
Page 1: ...Operating Instructions SHLG Source Holder Document ID 39089 Radiometric...
Page 2: ......
Page 4: ...4 39089 US 210509 Revision Table NOTES...
Page 14: ...14 39089 US 210509 For Your Safety NOTES...
Page 32: ...32 39089 US 210509 Operation NOTES...
Page 40: ...40 39089 US 210509 Dismounting NOTES...
Page 47: ......