To start the Throughout Test via VeSion follow the next steps:
1.
From the home page, click
On-Demand Test
.
2.
Make sure the right RTU-300 is selected if other devices are also being used by this VeSion server. Select the
test ports to be used on the left-hand side. Toggle in between the Port 1 & Port 2 configuration using the tabs
as shown below.
3.
Select
Throughput
from the
Test Type
drop-down menu at the bottom.