Vectaire EVO220DC Installation, Operating And Maintenance Instructions Download Page 5

Page 5

Cleaning and Maintenance

WARNING: The unit uses a 230V  supply and contains rotating mechanical parts.

•    Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be disconnected

.

The air filters and heat exchanger of the Vectaire EVO220 should be cleaned regularly by a suitably qualified person (the

frequency of cleaning will vary depending on the installation environment). Filters should be replaced after a maximum of 3

cleaning cycles.

Filters:

    Remove the filter covers on the main panel.

   Slide out the filters by pulling out the tabs

   Clean the filters carefully using a vacuum cleaner, replace in the slots and refit the filter covers 

Heat Exchanger:

   Firstly remove filters as described above

   Remove the screws securing the main panel and carefully lift off.  Using the plastic strap fitted, carefully pull out the heat

     exchanger

   Caution: if this is done during cold weather, the heat exchanger may contain water.  It is advisable to have a plastic bowl 

     available to avoid spillage.

   Lightly clean the faces of the heat exchanger with a vacuum cleaner.  Replace the heat exchanger carefully by sliding the

     assembly back into the cabinet.

   Replace the front cover by securing in place using the screws.

Finally, replace the filters as above.

Never use water or any other fluids to clean the heat exchanger.

•    

Return the heat exchanger and filters to their original position.

•    

Power to the unit can now be restored.

Filter Replacement

Filters should be replaced annually or after a maximum of 3 cleaning cycles.

Replacement filters are available from Vectaire - call us on +44 (0) 1494 522333 or via [email protected]

EVO220DC/lcd.021220

E & O.E

Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH

Tel: +44 (0)1494 522333.  Fax: +44 (0)1494 522337.  Email: [email protected]

Summary of Contents for EVO220DC

Page 1: ...EVO220DC Whole House Heat Recovery Unit with Low Energy DC Motor and LCD control for domestic and commercial use Installation Operating and Maintenance Instructions ...

Page 2: ...nit is commissioned individually allowing its per formance to be tailored to suit the performance required There will be a facility to boost the extraction rate when desired e g when cooking or bathing or pol lutant levels rise This may be done automatically or manually The system is designed to run continuously and should NOT be switched off except for maintenance or filter replacement It is impo...

Page 3: ...r living room The condensation drain must be fitted and if insulated use the equivalent of at least 25mm of insulating material with a thermal conductivity of 0 04 W mK Care should be taken to ensure that ducting is free from blockages before switching on the unit as this may invalidate your guarantee External grilles should be located a minimum of 600mm from any flue outlet in accordance with all...

Page 4: ...50Hz Consumption 0 92Amps The unit is supplied with A mains rated 4 core flexible cord black brown grey green yellow An optional factory fitted 2 cord volt free flexible cord for purge switching A triple pole isolation switch with contact separation of at least 3mm must be used to connect the appliance to the fixed wiring when using the Switched Live Boost controls must not be located within 1 met...

Page 5: ... plastic strap fitted carefully pull out the heat exchanger Caution if this is done during cold weather the heat exchanger may contain water It is advisable to have a plastic bowl available to avoid spillage Lightly clean the faces of the heat exchanger with a vacuum cleaner Replace the heat exchanger carefully by sliding the assembly back into the cabinet Replace the front cover by securing in pl...

Reviews: