INSTALLATION INSTRUCTIONS: Viewline 52 mm

TU00-0752-8707102

Technische Änderungen vorbehalten  -  Technical details subject to change

TU00-0752-8707102

Ammeter

Depending on the configuration, insert the cable into 

the 8-pin contact enclosure according to the following 

pin assignment. The contacts must audibly lock into 

place. 

Pin 1 - Term. 30 - battery 12/24 V 

Pin 2 - Term. 31 - ground 

Pin 3 - signal ground 

Pin 4 - Term. 15 - ignition plus 

Pin 5 - sensor signal 

Pin 6 - Term. 58 - lighting 

Pin 7 - programming port Tx 

Pin 8 - programming port Rx 

Now insert the plug into the gauge. Note the inverse 

polarity protection nose in the process. 

4

8

1

5

Place the flush mount seal A2C53215640 on the 

instrument glass. 

Put the instrument into the drill hole from the back. 

Adjust the instrument so that the gauge is level and 

fasten it to the stud bolts on the rear side of the panel, 

using the flush mount fixing bracket A2C59510864.

If the instrument is mounted flush (i.e., from the back 

so that the instrument glass and the panel form one 

plane), the front ring must be removed. Press the 

instrument glass with both thumbs, while at the same 

time pressing the front ring forward from the instrument 

with both index fingers. Note the use of a tool in the 

adjacent figure.

2

1

Flush assembly

The recommended panel thickness is 1.5 to 3 mm. 

The drill hole must have a diameter of 48.1 mm. 

Ensure that the installation location is level and has no 

sharp edges.

1.5...3 mm

dia. 48.1 mm

•  Do not drill holes or ports in load-bearing or stabilizing stays or tie bars! 
•  Note the necessary clearance behind the drill hole or port at the installation location. Required mounting depth: 

65 mm. 

•  Drill small ports; enlarge and complete them, if necessary, using taper milling tools, saber saws, keyhole saws 

or files. Debur edges. Follow the safety instructions of the tool manufacturer.

Summary of Contents for Viewline TU00-0752-8707102

Page 1: ...nical and electrical airbag area Do not drill holes or ports in load bearing or stabilizing stays or tie bars When working underneath the vehicle secure it according to the specifications from the vehicle manufacturer Note the necessary clearance behind the drill hole or port at the installation location Required mounting depth 65 mm Drill small ports enlarge and complete them if necessary using t...

Page 2: ...d the drill hole or port at the installation location Required mounting depth 65 mm Drill small ports enlarge and complete them if necessary using taper milling tools saber saws keyhole saws or files Debur edges Follow the safety instructions of the tool manufacturer Place the new front ring on the instrument and press it on until it is flush with the instrument glass The following rings may be in...

Page 3: ...n it to the stud bolts on the rear side of the panel using the flush mount fixing bracket A2C59510864 If the instrument is mounted flush i e from the back so that the instrument glass and the panel form one plane the front ring must be removed Press the instrument glass with both thumbs while at the same time pressing the front ring forward from the instrument with both index fingers Note the use ...

Page 4: ...ional area in question to heat up When installing electrical cables use the provided cable ducts and harnesses however do not run cables parallel to ignition cables or to cables that lead to large electricity consumers Fasten cables with cable ties or adhesive tape Do not run cables over moving parts Do not attach cables to the steering column Ensure that cables are not subject to tensile compress...

Page 5: ...erm 58 lighting INSTALLATION INSTRUCTIONS Viewline 52 mm GB TU00 0752 8707102 Technische Änderungen vorbehalten Technical details subject to change TU00 0752 8707102 Ammeter VDO Sensor A2C59514041 A2C59514043 A2C59514045 A2C59514047 General Terminal Diagram In special cases show the ship s electrical diagram to your boatyard or to a branch or agent and ask for advice on how to connect the sensors ...

Page 6: ...t torque is 1 5 Nm Place the bracket on the stud bolt and hand tighten the knurled nut Make sure the seal lays flat between the panel and the front ring see Fig 14 Please note that when you disconnect the battery all volatile electronic memories lose their input values and must be repro grammed Accessories Spare parts Bush contacts 0 25 0 5 mm A2C59510846 Bush housing 8 pin A2C59510847 Hand pliers...

Reviews: