Vacuum Packaging Machines 07P ...
Maintenance
13.3 Maintenance
work
We recommend that the machine has a full service once a year at least.
The VC999 Customer Service Department is available for all service and servicing, on request.
13.3.1 Displayed
servicing works
The machine monitors the required services intervals itself. The following messages appear at the
display.
every 2,000 operating hours:
PREVENTATIVE MAINTENANCE REQUIRED
every 100 operating hours:
CHECK VACUUM PUMP AND PNEUM. OIL LEVELS
every 4,000 packaging cycles:
CHECK SEALBARS PLEASE
IMPORTANT
Organize the required servicing works and confirm these messages with the STOP button.
When the key switch is set to "CLOSED" this message will appear again at every second start.
13.3.2 Service sealing bar and sealing pad
The Teflon strips (75) on the sealing bar (72) will show burn marks after a time and must be replaced. At
the same time the cutting and sealing wires must be replaced.
The sealing pads will develop unevenesses and burn points with time. Such sealing pads must be
ground down or replaced.
Procedure
•
Pull the sealing bar out of the support.
•
Release the cutting wire (70) by loosening the
threaded pin (74). Clean the cutting wire with
steel wool or replace it with a new one.
•
On both sides screw the clamping strips (76) off
and pull the Teflon strip (75) from the sealing
bar.
•
Clean the sealing bar in a well ventilated room
with acetone.
Fig. 13/3
CAUTION
Acetone is highly inflammable! No smoking! There is a danger of fire!
2003-11-05
Art. no. 527.763
Page 59/74
Summary of Contents for 07P Series
Page 2: ......
Page 4: ......
Page 69: ...Vacuum Packaging Machines 07P Circuit diagrams 2003 11 05 Art no 527 763 Page 69 74...
Page 70: ...Vacuum Packaging Machines 07P Circuit diagrams Page 70 74 Art no 527 763 2003 11 05...
Page 71: ...Vacuum Packaging Machines 07P Circuit diagrams 2003 11 05 Art no 527 763 Page 71 74...