1. Introduction
vatech A9 (Model: PHT-30CSS)
Installation Manual
1
En
gli
sh
1. Introduction
1.1
Manufacturer's Liability
As the manufacturer,
VATECH
assumes liability for the safe and reliable installation
and operation of this equipment only when:
Equipment installation, including software installation, was conducted by an
authorized agent by this installation manual.
The electrical installation was conducted by the appropriate requirements
specified in IEC-60363.
Genuine original or approved replacement parts are used.
Maintenance/repair service has been performed by a qualified technician(s) from
one of our authorized agents.
The equipment has been used under normal conditions by the user's manual.
PC Software has been properly used by the manufacturer’s installation
instructions and user manuals.
1.2
Customer’s Responsibility
Site planning and preparation are the responsibility of the customer. The following
points should be considered fundamentally important to all customers of this product:
Install all required materials before the delivery of the system.
Complete the floor, ceiling, and walls of the room before installing the equipment.
Install proper-sized junction boxes, with covers, at the necessary locations.
Install a mains power with the proper voltage output and an adequate kVA rating.
Install the circuit breaker specified by this manual.
Provide the installer(s) with the room's current dimensions, including the hallway
and entry door sizes.
The customer must have an electrician install more than two power outlets in the
room.