Assembly
(1of5)
1)
Cut straps with tin snip
2)
Using crow bar or claw hammer, pry off
plywood carefully
3)
Remove all wood supports
Caution!
The heating chamber sits on top of the conveyor pins. Lifting the chamber will separate the chamber from conveyor.
4)
Remove front and rear conveyor pieces, additional
(optional) legs, and any boxes shipped underneath
chamber.
-Use 9/16 or 15mm socket/wrench to remove lag bolts
5)
Remove side runner to slide
machine off pallet.
-Use 9/16 or 15mm socket/
wrench to remove lag bolts
Tools Needed
: (1) Crowbar or Claw Hammer, (2) 9/16” open end wrenches, (1) 7/16” open end wrench or socket,
(1) 1/4” nut driver or flat blade screw driver, (1) 1/8” allen wrench
Econored-II-54 shown for illustration purposes. Econored II and III are assembled and operated
in the same manner. Econored-III has a 3rd heater and is 18”(45.7cm) longer than Econored-II
Pg. 4