7)
Have a licensed electrician complete the electrical hook-up and fill out the warranty card. Send it back to Vastex
to validate your warranty. A wiring diagram has been included with this manual, and is also adhered to the inside
of the control box cover.
8)
Plug the wire from the conveyor motor into the motor cpc connector. (
Shown on Controls page 2)
9)
Have a licensed electrician test the shops voltage at the machines disconnect, for shops with less than 240V ser-
vice, it is necessary to auto tune your controller. This procedure can be found in the
Troubleshooting
section.
Please record your shops actual voltage here:______________________
Assembly
(4of5) Electrical
Motor CPC
Main Power
Feed
Spec Tag
ER-II-30
450
2020
X
X
30
7.2
Review spec tag and wiring diagram for electrical requirements.
FLA refers to Full Load Amps, NOT the recommended line size.
A licensed electrician should perform electrical installation.
Please follow the NEC for wire selection and sizing.
Do NOT use solid or aluminum wiring for main power hookup.
All connections, especially power hookup, should be checked
and tightened after one month of operation
Pg. 7