Installation
92
Please note:
If the VARTA Link is used
as current sensor, enter the
IP address
of
the
VARTA Link
.
Press
"Connect"
.
The coupled storage system is displayed
in the respective overview.
After coupling of a storage system and
retrieval of the storage system data by the
VARTA pulse neo, the "Cascade monitor"
is displayed.
It provides a full overview of the cascade:
Charging state of the cascade,
the current power,
the max. capacity of the cascade.
If several storage systems are to be
connected, repeat the installation in the
"Cascade manager".
Please note:
Up to 5 devices can be
coupled.
Please note:
Do not forget to complete
the guarantee registration of the energy
storage system in the VARTA portal.
Make sure that the device is connected to
the local network with an active internet
connection.
Summary of Contents for Pulse neo 3
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Page 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...