Installation
58
Connections at the distribution
The following connections must be
prepared:
Device connection:
Recommendation: 3 x 2.5 mm²,
Sensor cable: RJ12 (in scope of
delivery),
LAN connection.
Do not expose the sensor cable to
mechanical loads.
To keep losses as low as possible, the
line between the storage system and the
connection should have a
maximum
length of 20 m.
Preparation of AC connection to building
network
For connection to the building network,
the 3-wire AC connection line must be
connected to the provided AC connector.
At the end of the connection line, strip
the insulation by 55 mm.
Summary of Contents for Pulse neo 3
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page ...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page ...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label ...
Page 64: ...Installation 64 Three Phase ü Single Phase ü Not permitted û û ...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate ...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system ...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger ...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system ...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger ...