Subject to modification!
Updated 10/2017
77
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
8.8
Installing and connecting the storage cabinet
Plug the AC connector into the AC port. The catch audibly
engages.
Figure 15: AC port (rear of the storage cabinet)
Insert the sensor cable and the network cable into the
corresponding sockets.
Figure 16: Sockets (rear of the storage cabinet)