8.10
Initial commissioning
This section is intended for the
qualified electrician.
8.10.1
Checking the activation of the battery modules
If you do not perform initial commissioning directly after
the installation of the battery modules, the battery
modules have to be activated again. See Chapter 8.9.4
Installing and connecting battery modules.
8.10.2
Switching on
The VARTA element energy storage system is switched on as
follows:
Make sure that the network cable is connected.
Connect the fuse at the building grid.
Activate storage system using
On/Off
button. The button
will be locked in the lower position.
Figure 24:
On/Off
button