![background image](http://html2.mh-extra.com/html/varta/element-series/element-series_add-on-instructions_3577342123.webp)
Subject to modification! Updated 06/2017
123
EN
G
ener
al
Inst
all
atio
n
When adding on, an additional battery module is installed as
shown in Figure 4: Installation positions of the battery modules.
Lift the battery module onto the two support rails with the aid of the
handle.
Figure 3: Clamped connections of battery module (DRY contact)