Värmebaronen EK 13
Electrical installation
The installation must be carried out according to existing
regulations and standards under the supervision of a qualified
electrician.
The electric cartridge and heating system must be filled with
water and vented before the electric cartridge is connected to
the power supply.
All connections must be with high voltage-insulated cable.
Terminal block, supply
The electric cartridge is connected with 5 x 4 mm
2
cable with
3 x 20 A fuses.
The terminal block is in the automatic control cabinet.
1
2
Connection of circulation pump
Fused power outlet, 10 A, to supply the circulation pump, max.
load 1 A.
3
1
External blocking.
If the electric cartridge is to have tariff or external control, a 2-pole
relay must be connected as shown in the diagram below, 230 V.
The relay must be closed in operating mode and open in idle mode.
25
4
1
To external control unit
Connection delay after power cut
The electric cartridge has connection-delayed power stages after
a power cut according to the standard. This means that, after a
power cut that has lasted for more than three minutes, only power
stage one is connected, 6 kW. The remaining power is connected
approximately two hours after the power has returned.
For testing and inspection, the delay may be switched off
temporarily by short-circuiting the pins marked with arrows until
the LED goes out.
24
26
Limitation of power
The power of the electric cartridge may be limited by removing
jumpers as shown in the diagram below.
4
25
Load guard
A load guard VBB 12 TX is available as an accessory. It senses the
total load on the main fuses and reduces the power in the electric
cartridge in the event of overload. When the load on the main fuses
falls, the load guard reconnects the power disconnected in stages.
Further information is available in the instructions for the VBB 12TX.