6
Operation of the mixer:
A) Place the tool in the bowl. Open the bowl screen
B) Note: the bowl arms must be in the lowest position.
Place the bowl in the bowl arms. Check that the bowl
is pushed right back into the arms and that the “Third
ear” of the bowl is facing the mixer (fig. 3). Place the
mixer tool in the bayonet shaft. The tap of the tool must
be turned right into the bayonet hole. Close the bowl
screen.
C) The bowl is raised to working position by a clockwise
turn of the button for bowl lift - the JOG-button must be
pushed and kept pushed until the bowl is entirely up.
Ensure that the bowl is placed correctly. On the timer
set the mixing time required by turning the timer (fig
1) clockwise. The mixer will stop automatically, when
the time runs out. When the mixer has timed out, the
"procedure for starting after emergency stop" is used
before the mixer is re-started.
D) Start the mixer by pressing the green start button
(fig.1)
The mixer will only start when the bowl is in the "up"
position, the bowl screen is "closed", and the timer is
set to "time" or "hold".
E) Turn the speed selector lever (fig. 4) to the rear until
the required speed has been obtained, (notice the
recommended maximum speeds on page 7).
F) Before the mixer is stopped, the speed selector lever
must be moved back to lowest speed (fig.4).
G) Stop the mixer by pressing the red stop button (fig.1)
Start-up after stop at high speed:
1) This procedure must be used in cases where the mixer
has been interrupted in high speed.
2) Lower the bowl and remove the tool from the bayonet.
3) Close the bowl screen.
Raise the bowl arms, either empty or with the bowl.
4) Start the mixer and move the speed selector lever
back to lowest speed. Switch off the mixer. Now the
mixer can be started as usual.
JOG”- function:
The mixer is provided with a “JOG” button located
underneath the operating panel. The button must be
activated simultaneously with key for bowl lift when the
bowl is lifted
Before the bowl reaches its top position, the tool starts
rotating to dig its way into the ingredients.
First “ear”
Fig. 3
Mixer seen from above
, the
bowl has been pushed all
the way into the bowl arms.
Notice: the third “ear”
of the bowl is facing the
mixer
Fig. 4
Mixer with closed
bowl screen,
raised bowl and
mounted tool.
Fig. 1
Operation panel.
Fig. 2
Mixer with open bowl
screen, lowered bowl
and mounted tool.
Second “ear”
Third
“ear”
Bowl Lift
Start
Stop
Timer
JOG
button
Summary of Contents for V150PLM
Page 12: ...12 This page intentionally left blank...
Page 16: ...16 Bowl Arms V150PL...
Page 18: ...18 4 5 2 1 1 1 2 2 3 3 7 AR140 63M 6 7 8 9 Bowl Lift Microswitches V150PL...
Page 24: ...24 A Speed Lever System V150PL...
Page 26: ...26 1 5 8 14 6 13 12 10 14 2 3 4 11 14 15 16 17 7 Electrical Control Panel V150PL...
Page 28: ...28 2 6 1 7 8 9 10 4 10 6 12 3 11 13 15 14 16 Power Supply V150PL...
Page 30: ...30 Bowl Screen V150PL...
Page 32: ...32 11 8 8A 9 9A 10 10A 13 12 4 14 3 5 6 7 2 7A 15 16 17 18 19 1 Accessories V150PL...
Page 34: ...34 Wiring Diagram V150PL...
Page 35: ...35 Wiring Diagram V150PL 208V 208V...
Page 36: ...Varimixer USA 2215 East River Road Moraine Ohio 45439 P 800 222 1138 varimixerusa com...