Setting Up
Checking the Installation Site
Determine if the installation site meets the requirements listed in the
Pre-installation Instructions.
Unpacking
The MS, foreline pump, and gas chromatograph are heavy. To prevent
personal injury, use appropriate moving and lifting techniques.
While unpacking the system, check thoroughly for missing parts and shipping
damage. Use caution when unpacking the MS; do not use the transfer line as a
handle.
Using the transfer line to lifting the
instrument can result in damage to the
analyzer
.
Before setting up and starting the GC/MS, ensure that all parts and kits were
delivered and are complete. Review with the customer the contents of the
accessory kits and their functions.
Report all shipping damage or missing parts to the Customer Service department
(Phone: 925-939-2400, Fax: 925-945-2360, email: [email protected]),
Varian, 2700 Mitchell Drive, Walnut Creek, CA, 94598.
Note any shipping damage or missing items on the installation checklist and in
the Installation Tracking Database.
Connecting Components
1. Set the GC, MS, and PC on the bench.
2. Check that the instruments are wired for the installation site voltages.
3. Keep the GC and MS separate at least 46 cm (18 in.) to allow easy access to
both instruments.