Overview
Before scheduling the installation, call the customer to determine if they have met
the site requirements listed in the Pre-Installation Instructions
.
The critical site
requirements are bench space and load, power, temperature, humidity, carrier
gas purity (helium), and CI gas purity (methane).
Use these procedures to set up the 210-MS and the 220-MS GC/MS Ion Trap
(210/220-MS GC/MS), meet product specifications, and familiarize the customer
with the system. Also, test and demonstrate the CI ionization mode if it was
purchased.
Under normal circumstances, the installation of the 210/220-MS GC/MS Ion Trap
with EI requires 2 days on site.
Typical Installations
NOTE: Unless specified, these instructions are for both the 431-GC and the
450-GC
1. System unpacking, setup and checking
2 hours
2. Power up, pump down, demo
4 hours
3. Verification of GC/MS System Operation
2 hours
4. EI checkout and demo
1 hours
5. Additional customer familiarization
4 hours
Option Installation
1. Autosampler installation, check out, familiarization 1.5 hours
2. CI ionization mode demo, familiarization
0.5 hour
3. MS/MS demo
0.5 hour
Enter installation results into the Installation Tracking Database.
NOTE: Test samples are not shipped overseas with the system. Before going on
site to do an installation, ensure that you have all the necessary samples, or that
they have been shipped to the customer from a local Varian office. Installation
engineers outside of the USA should confirm the availability of test samples from
their home office as much as two weeks in advance. For US shipments the
samples are shipped with the system.