Vaporless ARM-4073 Installation & Operation Manual Download Page 8

Vaporless Manufacturing, Inc. 

8700 East Long Mesa Drive, Prescott Valley, Arizona   86314 

800-367-0185     928-775-5191     Fax:  928-775-5309 

Email:  [email protected]    Web Site:  

www.vaporless.com

 

12.

 

Leak Test Confirmation

 

 

With the dispenser authorized, the turbine will start running. Again, note that with the selector 
in the 

GPH

 

T

EST

 

position a 3 GPH leak has been introduced to the system. Watch the right-hand 

pressure gauge as the turbine builds pressure. The pressure should build to the value noted in 
Step 10. 

TECHNICAL NOTE

 — If the pressure indicated on the right-hand pressure gauge does not 

stabilize at the lower pressure, but rather steps through to the higher normal operating value, 
the leak detector has failed the leak test. Contact the factory for calibration information. 

 

Turn the selector to the

 P

RESSURE 

S

TEP 

T

EST

 

position. Following a short delay, the pressure should 

step up to the value noted in Step 8. This is the indication that the mechanical leak detector has 
properly transferred from its leak test position to its full flow position. 

13.

 

Auto-Repressure Test

 

 

Remove the dispenser authorization. With the large beaker under the discharge hose, set the 
selector to the 

D

ISPENSER 

N

OZZLE

 

position. Fuel will flow into the beaker. After the reading on 

the right-hand pressure gauge falls to zero, set the selector to the

 P

RESSURE 

S

TEP 

T

EST

 

position.

 

14.

 Set  the  ARM-4073  power  switch  to  the  O

N

  position  (refer  to  Power  On-Off  Switch).  The 

turbine  will  start  running.  Immediately  return  to  the  dispenser.  On  the  right-hand  pressure 
gauge of the LDT-890, verify that normal operating has been achieved. Set the selector on the 
LDT-890 to the

 GPH

 

T

EST

 

position. This will introduce a 3 GPH leak to the system. 

Because 

the  leak  detector  has  already  stepped  through  to  its  fully  open  position,  nothing  will 
change.

 This leak must be introduced to the system before the 30 second (or 70 second) pump 

timer has completed its timing cycle. 

15.

 At the end of the pump timing cycle, the ARM-4073 will automatically turn off the turbine. 

On the right-hand pressure gauge of the LDT-890, verify that the pressure falls due to the 3 
GPH leak. If the proper delay timer has been selected from Table 2, the pressure should fall to 
zero before the next automatic pump cycle is started. 

16. 

At the end of the delay timing cycle, the ARM-4073 will automatically turn on the turbine. 
Pressure will begin to build but will stop at the value observed in Step 10 indicating that the 
leak detector has found the 3 GPH leak. This successfully completes the ARM-4073 test. 

17.

 

Disconnect LDT-890 Test Unit

 

 

Turn off the appropriate power breaker. Turn off the ARM-4073 power switch. 

18.

 With  the  large  beaker  under  the  LDT-890  discharge  hose,  set  the  selector  to  the

  D

ISPENSER 

N

OZZLE

 

position and bleed off fuel until the reading on the right-hand pressure gauge is zero. 

19.

 Disconnect the quick disconnect coupler attaching the test unit to the whip hose. 

20.

 Remove the whip hose from the test port and install the original plug. The application of thread 

sealing compound to the plug is recommended. 

 

Summary of Contents for ARM-4073

Page 1: ...Quality Petroleum Equipment Solutions for Over 30 Years ARM 4073 Automatic Repressure Module Installation Operation Manual Rev 05 08 2021 ...

Page 2: ...llowing statements outline the operation of the ARM 4073 1 With power applied the module is active and performs its timing functions The pump timer is the first to operate following the application of power Following the completion of the pump cycle the delay timer determines the elapsed time to the next pump cycle 2 There is a small switch module located in the center of the circuit board This mo...

Page 3: ...o difference whether the turbine s at your site are single phase or three phase The ARM 4073 only controls the coil on the turbine contactor just as any other authorization signal would The vast majority of installations for the ARM 4073 can be described with Figure 1 located on page 10 of this manual If you feel that your site is unique in some way please do not hesitate to consult with VMI for t...

Page 4: ...ith the lever positioned toward the terminal block power is applied to the module on position With the lever positioned away from the terminal block power is removed from the module off position Care should be exercised when operating the switch as voltage may be present on the L1 L2 terminals MEASURING SYSTEM BLEED BACK When under pressure all closed piping systems exhibit an elastic response tha...

Page 5: ...se set the selector to the DISPENSER NOZZLE position Purge the tester of air by allowing 800 to 1000 ml of fuel to flow into the beaker After purging the LDT 890 set the selector to the PRESSURE STEP TEST position 11 Purge the dispenser line by running several gallons of fuel into an approved safety container 12 Bleed Back Measurement Remove the dispenser authorization The turbine should stop runn...

Page 6: ... the bleed back measurement procedure and set up of the ARM Repressure Module A 3 GPH test should now be completed LEAK DETECTOR TEST AT 3 GPH Whether a new installation or the retrofit of an existing installation using VMI Leak Detectors a leak test should be performed This is done to ensure that the VMI Leak Detector is operating normally and that the selected ARM delay time is long enough for t...

Page 7: ...ZZLE position Fuel will begin to flow into the beaker After the reading on the right hand pressure gauge falls to zero set the selector to the PRESSURE STEP TEST position 8 Read Operating Pressure Authorize the dispenser The turbine will start running Watch for the turbine to achieve operating pressure as seen on the right hand pressure gauge Note this pressure reading and then remove the authoriz...

Page 8: ...Switch The turbine will start running Immediately return to the dispenser On the right hand pressure gauge of the LDT 890 verify that normal operating has been achieved Set the selector on the LDT 890 to the GPH TEST position This will introduce a 3 GPH leak to the system Because the leak detector has already stepped through to its fully open position nothing will change This leak must be introduc...

Page 9: ...3 Automatic Repressure Module is now fully functional and actively working to eliminate slow flow issues TIMER SWITCH SETTINGS Table 1 Pump Timer Switch Setting Switch Number Pump Time 1 OFF 30 seconds ON 70 seconds Table 2 Delay Timer Switch Settings Bleed Back ml Switch Number Delay Time minutes 2 3 4 5 150 OFF OFF OFF OFF 2 0 350 ON OFF OFF OFF 4 5 550 OFF ON OFF OFF 7 0 700 ON ON OFF OFF 9 5 9...

Page 10: ...om If you have any questions or concerns after reading this manual please contact VMI We are committed to customer service and the safety and satisfaction of our customers Manufactured by Vaporless Manufacturing Inc Electronics Division 8700 East Long Mesa Drive Prescott Valley Arizona 86314 Phone 928 775 5191 Website www vaporless com Technical Support electronics vaporless com ...