E2 - Replace Main PCB (Printed Circuit Board)
IMPORTANT NOTE:
Use extreme caution when servicing the lift. The PCB should be handled
with care. Use of proper E.S.D. protection to prevent damage to the circuit board is highly
recommended.
Contact with metal objects (screw drivers, rings, etc.) will damage the PCB.
1.
Before starting,
disconnect the RED battery wire
and all wire harnesses and all air tubes
(remove off from the steel pins) from the PCB.
2.
Before installation of new PCB, test the new PCB to ensure that the diagnosed problem will
be solved. Attach all wire harnesses and reconnect the battery wire.
Test lift unit. If lift unit
still does not function, the problem is elsewhere.
Contact customer service for further
instructions.
3.
Remove the mounting screws (M3 x 8mm hex socket cap screw) using a 3mm allen key.
4.
Carefully remount the PCB and tighten screws.
Do not over-tighten screws
.
5.
Attach all wire harnesses and reconnect the battery wire. Test lift unit.
P-600 Technical Manual
REV: 101316
Page 16
Summary of Contents for P-600
Page 1: ...Manufactured for P 600 Technical Manual ...
Page 10: ...P 600 Technical Manual REV 101316 Page 10 ...
Page 12: ...P 600 Technical Manual REV 101316 Page 12 ...
Page 13: ...P 600 Technical Manual REV 101316 Page 13 ...
Page 23: ...P 600 Technical Manual REV 101316 Page 23 ...
Page 24: ...Service Parts List P 600 P 600 Technical Manual REV 101316 Page 24 ...
Page 25: ...P 600 Technical Manual REV 101316 Page 25 ...
Page 26: ...P 600 Technical Manual REV 101316 Page 26 ...
Page 27: ...P 600 Technical Manual REV 101316 Page 27 ...
Page 28: ...P 600 Technical Manual REV 101316 Page 28 ...
Page 29: ...P 600 Technical Manual REV 101316 Page 29 ...
Page 30: ...P 600 Technical Manual REV 101316 Page 30 ...
Page 31: ...P 600 Technical Manual REV 101316 Page 31 ...