46
Revision D November 2022
B) Monorail Assembly for Tension Strut Backup (Figure 54).
Locate Monorail on foundation with side of Monorail on the construction line and rear edge of
Backup foot 4” forward of edge of foundation (
Figure 54).
Drill 5 1/2” [140 mm] deep anchor holes using the Monorail as a template. Do not drill through
foundation.
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive
.
5) Attach Side Panels and/or Transition Panels to Backup Assembly (Figure 55).
a. Attach Hinge Plate to the Transition Panel or Side Panel using 5/8” rail bolt and 5/8”
rail nut (two places – top and bottom holes only).
b. Attach Transition Panel or Side Panel assembly to side of Backup using 5/8” x 4” hex
bolt, 5/8” lock washer and 5/8” hex nut at three places on each side of Backup (Figure
55).
c. Attach diagonal brace to Fender Panel and Backup using 3/8” hex bolt, 3/8” lock
washer and 3/8” hex nut (two places per brace: 4 places per side).
d. Secure each diagonal brace with 3/8” hex bolt, 3/8” lock washer, and 3/8” hex nut (two
places per brace) as shown in Figure 55.
Figure 54
Backup and Monorail Location for Tension Strut Backup