INSTALLATION INSTRUCTIONS
CSA approved for use with
Valor Models 530I Heaters ONLY
Notes:
This kit must be installed or serviced by a qualifi ed
installer, service agency or gas supplier. These instructions are to
be
used in conjunction with the main installation instructions
for Valor heater model 530I.
The installation of this kit affects the framing and method of
installing the 530 heater.
Installation Sequence
1. Frame the cavity.
2. Install the heater with stud brackets, stand-offs, insulation, wall switch
kit, and cement board.
3. Gas
fi t and vent heater.
4. Drywall only (no tile, etc.).
5. Assemble and install the mounting frame.
6. Install
fi nishing material (tile, etc.). Finish around or under 570 Finishing
Plate if using it.
7. Install the trim panel fi tted with the barrier screen.
I N S TA L L E R
L e a v e t h i s m a n u a l
w i t h t h e a p p l i a n c e .
C O N S U M E R
R e t a i n t h i s m a n u a l
f o r f u t u r e r e f e r e n c e .
HOT GLASS
WILL
CAUSE BURNS.
DO NOT TOUCH
GLASS
UNTIL COOLED.
NEVER
ALLOW CHILDREN
TO TOUCH GLASS.
WARNING
!
A barrier designed to reduce the risk of burns from the hot viewing
glass is provided with this appliance and shall be installed
for the protection of children and other at-risk individuals.
P
ORTRAIT
© Copyright Miles Industries Ltd., 2013.