48
Install Long Beach Driftwood 1705DWK
Material required
• Small container to distribute vermiculite (not
supplied)
• Long Beach Driftwood Kit, which contains:
◊ 6 logs
◊ 10 pebbles
◊ 1 bag of vermiculite
Installation
Vermiculite
Carefully unpack the kit.
1. Carefully spread vermiculite by hand, on the
surface of burner only, forming a single layer to the
approximate level of the top of the fl ange at the
edge of the burner.
Do not pour from the bag to
avoid fi ne particles blocking the burner ports.
Do not use the entire bag.
NOTE:
Ensure the area within the pilot shield
is clear of vermiculite. Some vermiculite can be
deposited into the pilot safe zone.
Logs and rocks
Each log has pegs to help you locate it on the media
tray. Install the logs as shown below using the
round
holes
.
1. Place the rear left log at the left end of the media
tray as indicated. Its narrow end rests on the
vermiculite as indicated.
INSTALLATION
Pilot shield
Round hole—use
the round holes
QUALIFIED
INSTALLER