28
Install Top Stando
ff
s
If installing using combustible framing, the included
stando
ff
s on top of the unit must be set up. When
shipped, the stando
ff
s are installed laying
fl
at against the
unit and screwed in at one end.
Each stando
ff
has three perforated lines on it. Fold along
the perforations to create a triangular shape.
Fold x3
Appliance Preparation
Once all four stando
ff
s are folded up, screw each one
down at its remaining connection point.
Combustible framing above the
fi
replace may not be
used below the top of the installed stando
ff
s.
If installing the Steel Framing Kit, you may simply
unscrew and discard the stando
ff
s.
Screw
Installing Standoffs