![Valor LT1 2500KN Installation Manual Download Page 11](http://html1.mh-extra.com/html/valor/lt1-2500kn/lt1-2500kn_installation-manual_3732639011.webp)
11
Combustible Mantel—Left Side View
Installation Planning
Mantel Clearances
WARNING
HeatShift System MUST be
installed on this appliance!
Bottom of Unit
6”
10”
19-1/2”
Opening in
Tr
im
8-3/4”
Note: Combustible
wall finish up to
1” thick may be
installed over
non-combustible
board (not included
with appliance) and
butt up to the trim
all around the opening.
DO NOT COVER
THE TRIM!
Non-combustible board
as specified in this manual
1” trim
1” trim
4” minimum to
combustible
hearth
Combustible
materials must
be kept behind
this line
28-3/16”
34-3/16”
38-3/16”
45°
Mantel
Height
(from
Bottom
of Unit)
Vent
HeatShift pipes (4)